Commercial EV charging 2026

Commercial EV chargers for business: costs, grants and installation

EV charging for business is no longer a perk: it's the fuel station for your vans, your pool cars and the staff who've switched. This guide covers which commercial EV chargers suit staff, fleet and visitor parking, what really drives the cost, how to avoid a grid upgrade you don't need, and the money on the table: the £500 per socket Workplace Charging Scheme, a 100% tax allowance and a rates exemption.

Updated 28 October 2026 · Independent guide, not the government's Great British Energy (gbe.gov.uk) · Checked against GOV.UK, Ofgem and scheme sources

£500Workplace Charging Scheme grant per socket, up to 40 sockets
100%First-year tax allowance on chargepoint kit to 31 March 2027
To 2035Plant powering EV chargepoints kept out of rateable value (England)
£0Taxable benefit on free workplace charging offered to all staff
Business, farm, school or charity? You're in the right place. Want a charger at home instead? Home EV charger grants →

Business EV charging: key facts for 2026

The grantThe Workplace Charging Scheme pays up to £500 per socket (it went up from £350 on 1 April 2026), capped at 75% of costs, for up to 40 sockets across all your sites. That's up to £20,000. Funding runs until 31 March 2027, its final year.
What closedThe EV infrastructure grant for staff and fleets and the commercial landlord chargepoint grant both closed to applications on 31 March 2026. If a supplier still quotes them, the quote is out of date.
Tax allowanceBusinesses of all sizes, including sole traders and partnerships, can claim a 100% first-year allowance on new EV chargepoint plant, including the groundworks and dedicated electrical supply (to 31 March 2027 for Corporation Tax, 5 April 2027 for Income Tax).
Business ratesIn England, plant that stores, transforms or transmits power to EV chargepoints is excluded from rateable value until 1 April 2035 (SI 2022/405).
Staff chargingHMRC says free workplace charging creates no taxable benefit for employees, as long as it's available to staff generally at that workplace and isn't part of a salary sacrifice arrangement.
Public chargersIf the public can use your chargers, the Public Charge Point Regulations 2023 apply: new public chargepoints of 8kW and above need contactless payment.

Commercial EV chargers: AC or DC rapid?

The first decision is power. GOV.UK's commercial chargepoint minimum technical specification, which every chargepoint must meet to qualify for the Workplace Charging Scheme, sorts commercial EV chargers into these output bands:

Type (GOV.UK spec)Output per outletBest for
Standard ACAbove 3.5kW, up to 7kW (single-phase)Staff parked all day, employees' homes for company cars, small sites with limited supply
Fast ACAbove 7kW, up to 23kW (single or three-phase)The workhorse of workplace charging: 7kW or 22kW posts for staff, pool cars and visitor bays
Semi-rapid ACAbove 23kW, up to 43kW (three-phase)Niche: vehicles that can take high AC power
Semi-rapid DCAbove 22kW, up to 50kWFleet depots needing a quicker top-up between shifts
Rapid DCAbove 50kW, up to 62.5kWVan fleets, taxis, customer-facing sites, short dwell times

Slow AC below 3.5kW isn't permitted under the spec. AC units must use Mode 3 charging with Type 2 sockets; DC units use Mode 4. Two details matter when comparing quotes:

  • Rated power assumes the supply can deliver it. The spec says that where local supply limits stop a charger running at full rated output, it is classed by its actual output. A "22kW" post on a constrained supply may really be a 7kW post.
  • Twin outlets share power. A multi-outlet unit is classified by the power each outlet gives with all of them running at once.

The rule of thumb is dwell time. Cars parked for a full shift rarely need more than fast AC. Vehicles that turn round in an hour or two need DC.

Staff, fleet, visitor and public charging: who are the chargers for?

Who plugs in decides which chargers you buy, whether you can get the grant and which regulations apply.

UseTypical set-upGrant positionWatch out for
Staff chargingFast AC posts in staff bays, access by RFID card or appWCS eligible: up to £500 per socketDecide whether staff pay. Free charging available to all staff is not a taxable benefit
Fleet EV chargingDepot AC for overnight, DC for quick turnarounds, smart schedulingWCS eligible for fleet baysSupply capacity when every van plugs in at 6pm. Load management is essential
Visitor and customer chargingFast AC in customer bays, pay-per-use app or contactlessNot for businesses: customer-only parking can't get the WCS. Charities, public bodies and small accommodation businesses can open chargers to anyonePublic Charge Point Regulations 2023 if the public can use them
Public charging hubRapid DC, often run by a charge point operator on your landNo WCS for public-only bays at a business siteContactless on 8kW+, a 99% reliability target for rapid networks (50kW+), open data and a helpline
Employees' homes7kW home units for company carsWCS can cover these where the employee can't charge at workEvidence letter and a chargepoint approved for residential and commercial use

The Public Charge Point Regulations 2023 say a workplace charge point isn't a public one. Most of their duties (contactless, reliability, data and helpline) don't apply to a charge point operator that is a micro business, but pricing in pence per kWh must be displayed by everyone. If you're planning a public offer, ask your installer who will act as the charge point operator.

Load management and supply capacity: the hidden cost

The single biggest swing in a commercial EV charging quote is not the charger. It's whether your existing electrical supply can carry the extra load. Ten 7kW chargers running at once need around 70kW on top of everything else the building uses. Ten 22kW posts need far more.

  • Dynamic load management shares the available capacity between chargers and backs off when the building needs power. It often means you can install more sockets without a bigger supply. Chargepoints must also comply with the Electric Vehicles (Smart Charge Points) Regulations 2021.
  • A DNO upgrade is needed when the site simply doesn't have enough capacity. The distribution network operator quotes for new cables or a substation, and the timescale is set by them, not your installer. Ask for a capacity check before you order chargers.
  • Solar and batteries can take some of the load off the grid in the daytime. See below.
  • Vehicle-to-grid (V2X). Chargers that can export power need ENA G98 or G99 approval, depending on their size.

Ask for this first: your maximum import capacity (kVA) and 12 months of half-hourly data. With those, an installer can show how many sockets fit with load management and whether a DNO application is needed at all.

What does commercial EV charging cost?

There's no official national price series for commercial EV chargers, so treat any headline "per charger" price with caution. What a business pays is driven by:

  • Charger type and number of sockets: AC posts versus DC rapid units, wall-mounted or pedestal, single or twin.
  • Groundworks: trenching across tarmac, ducting, bases, bollards and bay marking. Distance from the switchboard often costs more than the charger itself.
  • Supply: a new sub-main or distribution board, load management hardware, and any DNO upgrade.
  • Software: the back-office platform for access control, payment, driver billing and reporting, usually charged as a monthly fee per charger.
  • Maintenance: service contracts after the warranty. Chargepoints funded by the WCS must come with a 3-year on-site warranty on parts and installation.

How the grant and tax cut the bill

ReliefWhat it doesDeadline
Workplace Charging SchemeUp to £500 per socket, capped at 75% of eligible costs including VAT, for up to 40 sockets (£20,000)Applications close 31 March 2027
100% first-year allowanceDeduct the whole cost of new chargepoint plant, its groundworks and dedicated supply, from taxable profits31 March 2027 (corporation tax), 5 April 2027 (income tax)
Business rates exemption (England)Plant that stores, transforms or transmits power to EV chargepoints, excluded from rateable valueUntil 1 April 2035
VATStandard 20%, which VAT-registered businesses can normally reclaimOngoing

The back-office software and maintenance fees are ongoing costs. They aren't eligible for the WCS, so get them written into the quote. For home charger prices, see our EV charger costs guide.

Payment and back-office software

Commercial EV chargers are networked. The software behind them decides how useful the chargers are day to day:

  • Access control: restrict bays to staff and fleet cards, or open them to visitors at set times. Businesses using the WCS can let local residents charge outside working hours.
  • Tariffs and payment: free for staff, cost-price, or a pence-per-kWh tariff, by app, RFID or contactless.
  • Fleet reporting: energy per vehicle, per driver and per cost centre, so you can reimburse home charging fairly.
  • Smart scheduling: charge overnight on cheaper rates, or soak up solar in the day.
  • Uptime monitoring: remote diagnostics and alerts, which matter if you sell charging to the public.

Ask whether the chargers use an open protocol, so you can change software provider later without replacing hardware.

Pair EV charging with solar panels and carports

EV charging adds a large, predictable daytime load to a business site, which is exactly what makes commercial solar panels pay back faster. Each kWh of solar that goes into a van battery replaces a kWh bought at your full business unit rate.

  • Solar carports put the panels over the bays you're already wiring, with charging posts built in. Read solar carports for business.
  • Batteries store midday solar for evening fleet charging and can cut peak demand. See commercial battery storage.
  • One survey, one connection: designing solar, battery and chargers together means one DNO application and one set of groundworks.

EV charger grant for business: what's open and what's closed

The only government EV charger grant open to businesses in 2026 is the Workplace Charging Scheme: up to £500 per socket, 75% of costs, 40 sockets, until 31 March 2027. You need a voucher before any work starts, an OZEV-authorised installer, and chargers from the approved commercial model list. State-funded schools can get up to £2,000 per socket.

The EV infrastructure grant for staff and fleets and the commercial landlord chargepoint grant both closed to applications on 31 March 2026. The residential landlord infrastructure grant closed too. Landlords with residential car parks can still use the residential landlord chargepoint grant: see EV grants for landlords.

For every other funding route, from tax allowances to regional loans, see business energy grants.

From enquiry to switch-on

  1. Tell us about the site: vehicles, parking, who'll charge and your supply.
  2. Survey: supply capacity, cable routes, groundworks and bay layout.
  3. Design and quote: charger types, load management, software, grant deduction and any DNO work.
  4. Apply for the WCS voucher before anything is installed. Vouchers last 180 days.
  5. Install and commission: to BS 7671 and the IET Code of Practice, with an Electrical Installation Certificate.
  6. Go live: set up access, tariffs and reporting, and the installer claims the grant.

What to ask commercial EV installers

  • Are you OZEV-authorised for commercial chargepoints, and is every model on the approved list?
  • What's my maximum import capacity, and how many sockets fit with load management?
  • Is a DNO application needed, and who handles it?
  • What are the software, data and maintenance fees per charger per year, and what's the contract length?
  • Will you duct extra bays now so we can add chargers later without more groundworks?
  • If the public can use them, who acts as the charge point operator under the 2023 Regulations?

We pass your enquiry to one commercial installer. No ring-rounds, no lists, and your details aren't sold on.

Sources checked 28 October 2026

Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.

Business EV charging questions

Is there a grant for business EV chargers in 2026?

Yes. The Workplace Charging Scheme pays up to £500 per socket, capped at 75% of costs including VAT, for up to 40 sockets across all your sites. It's open to businesses, charities, public sector bodies and small accommodation businesses until 31 March 2027.

Should a business install AC or DC chargers?

It depends on how long vehicles stay parked. Cars parked for a working day are well served by fast AC chargers (above 7kW, up to 22kW). Vans or cars that turn round in an hour or two need DC charging, which starts above 22kW and reaches rapid speeds above 50kW.

Can a business claim EV chargers against tax?

Usually, yes. HMRC allows a 100% first-year allowance on new plant for an EV charging point, including groundworks and the dedicated electrical supply, for spending up to 31 March 2027 for corporation tax or 5 April 2027 for income tax. Check with your accountant.

Is free workplace charging a taxable benefit for staff?

No, as long as charging is available to employees generally at that workplace and isn't offered through salary sacrifice. HMRC says no taxable benefit arises for the electricity in that case.

Do EV chargers increase business rates?

Not in England before 1 April 2035. Plant and machinery used mainly to store, transform or transmit power to an EV charging point is excluded from rateable value under the 2022 regulations.

Do I need a grid upgrade for commercial EV charging?

Not always. Dynamic load management shares your existing capacity across the chargers and often avoids an upgrade. If the site doesn't have enough capacity, the distribution network operator quotes for the upgrade. Ask for a capacity check before ordering chargers.

Get your site quoted properly

Two minutes now saves weeks of ring-rounds. Tell us about your site and we will introduce one suitable installer.

Get a free business EV charging quote →
Get a free business EV charging quote →