Business EV charging: key facts for 2026
Commercial EV chargers: AC or DC rapid?
The first decision is power. GOV.UK's commercial chargepoint minimum technical specification, which every chargepoint must meet to qualify for the Workplace Charging Scheme, sorts commercial EV chargers into these output bands:
| Type (GOV.UK spec) | Output per outlet | Best for |
|---|---|---|
| Standard AC | Above 3.5kW, up to 7kW (single-phase) | Staff parked all day, employees' homes for company cars, small sites with limited supply |
| Fast AC | Above 7kW, up to 23kW (single or three-phase) | The workhorse of workplace charging: 7kW or 22kW posts for staff, pool cars and visitor bays |
| Semi-rapid AC | Above 23kW, up to 43kW (three-phase) | Niche: vehicles that can take high AC power |
| Semi-rapid DC | Above 22kW, up to 50kW | Fleet depots needing a quicker top-up between shifts |
| Rapid DC | Above 50kW, up to 62.5kW | Van fleets, taxis, customer-facing sites, short dwell times |
Slow AC below 3.5kW isn't permitted under the spec. AC units must use Mode 3 charging with Type 2 sockets; DC units use Mode 4. Two details matter when comparing quotes:
- Rated power assumes the supply can deliver it. The spec says that where local supply limits stop a charger running at full rated output, it is classed by its actual output. A "22kW" post on a constrained supply may really be a 7kW post.
- Twin outlets share power. A multi-outlet unit is classified by the power each outlet gives with all of them running at once.
The rule of thumb is dwell time. Cars parked for a full shift rarely need more than fast AC. Vehicles that turn round in an hour or two need DC.
Staff, fleet, visitor and public charging: who are the chargers for?
Who plugs in decides which chargers you buy, whether you can get the grant and which regulations apply.
| Use | Typical set-up | Grant position | Watch out for |
|---|---|---|---|
| Staff charging | Fast AC posts in staff bays, access by RFID card or app | WCS eligible: up to £500 per socket | Decide whether staff pay. Free charging available to all staff is not a taxable benefit |
| Fleet EV charging | Depot AC for overnight, DC for quick turnarounds, smart scheduling | WCS eligible for fleet bays | Supply capacity when every van plugs in at 6pm. Load management is essential |
| Visitor and customer charging | Fast AC in customer bays, pay-per-use app or contactless | Not for businesses: customer-only parking can't get the WCS. Charities, public bodies and small accommodation businesses can open chargers to anyone | Public Charge Point Regulations 2023 if the public can use them |
| Public charging hub | Rapid DC, often run by a charge point operator on your land | No WCS for public-only bays at a business site | Contactless on 8kW+, a 99% reliability target for rapid networks (50kW+), open data and a helpline |
| Employees' homes | 7kW home units for company cars | WCS can cover these where the employee can't charge at work | Evidence letter and a chargepoint approved for residential and commercial use |
The Public Charge Point Regulations 2023 say a workplace charge point isn't a public one. Most of their duties (contactless, reliability, data and helpline) don't apply to a charge point operator that is a micro business, but pricing in pence per kWh must be displayed by everyone. If you're planning a public offer, ask your installer who will act as the charge point operator.
Load management and supply capacity: the hidden cost
The single biggest swing in a commercial EV charging quote is not the charger. It's whether your existing electrical supply can carry the extra load. Ten 7kW chargers running at once need around 70kW on top of everything else the building uses. Ten 22kW posts need far more.
- Dynamic load management shares the available capacity between chargers and backs off when the building needs power. It often means you can install more sockets without a bigger supply. Chargepoints must also comply with the Electric Vehicles (Smart Charge Points) Regulations 2021.
- A DNO upgrade is needed when the site simply doesn't have enough capacity. The distribution network operator quotes for new cables or a substation, and the timescale is set by them, not your installer. Ask for a capacity check before you order chargers.
- Solar and batteries can take some of the load off the grid in the daytime. See below.
- Vehicle-to-grid (V2X). Chargers that can export power need ENA G98 or G99 approval, depending on their size.
Ask for this first: your maximum import capacity (kVA) and 12 months of half-hourly data. With those, an installer can show how many sockets fit with load management and whether a DNO application is needed at all.
What does commercial EV charging cost?
There's no official national price series for commercial EV chargers, so treat any headline "per charger" price with caution. What a business pays is driven by:
- Charger type and number of sockets: AC posts versus DC rapid units, wall-mounted or pedestal, single or twin.
- Groundworks: trenching across tarmac, ducting, bases, bollards and bay marking. Distance from the switchboard often costs more than the charger itself.
- Supply: a new sub-main or distribution board, load management hardware, and any DNO upgrade.
- Software: the back-office platform for access control, payment, driver billing and reporting, usually charged as a monthly fee per charger.
- Maintenance: service contracts after the warranty. Chargepoints funded by the WCS must come with a 3-year on-site warranty on parts and installation.
How the grant and tax cut the bill
| Relief | What it does | Deadline |
|---|---|---|
| Workplace Charging Scheme | Up to £500 per socket, capped at 75% of eligible costs including VAT, for up to 40 sockets (£20,000) | Applications close 31 March 2027 |
| 100% first-year allowance | Deduct the whole cost of new chargepoint plant, its groundworks and dedicated supply, from taxable profits | 31 March 2027 (corporation tax), 5 April 2027 (income tax) |
| Business rates exemption (England) | Plant that stores, transforms or transmits power to EV chargepoints, excluded from rateable value | Until 1 April 2035 |
| VAT | Standard 20%, which VAT-registered businesses can normally reclaim | Ongoing |
The back-office software and maintenance fees are ongoing costs. They aren't eligible for the WCS, so get them written into the quote. For home charger prices, see our EV charger costs guide.
Payment and back-office software
Commercial EV chargers are networked. The software behind them decides how useful the chargers are day to day:
- Access control: restrict bays to staff and fleet cards, or open them to visitors at set times. Businesses using the WCS can let local residents charge outside working hours.
- Tariffs and payment: free for staff, cost-price, or a pence-per-kWh tariff, by app, RFID or contactless.
- Fleet reporting: energy per vehicle, per driver and per cost centre, so you can reimburse home charging fairly.
- Smart scheduling: charge overnight on cheaper rates, or soak up solar in the day.
- Uptime monitoring: remote diagnostics and alerts, which matter if you sell charging to the public.
Ask whether the chargers use an open protocol, so you can change software provider later without replacing hardware.
Pair EV charging with solar panels and carports
EV charging adds a large, predictable daytime load to a business site, which is exactly what makes commercial solar panels pay back faster. Each kWh of solar that goes into a van battery replaces a kWh bought at your full business unit rate.
- Solar carports put the panels over the bays you're already wiring, with charging posts built in. Read solar carports for business.
- Batteries store midday solar for evening fleet charging and can cut peak demand. See commercial battery storage.
- One survey, one connection: designing solar, battery and chargers together means one DNO application and one set of groundworks.
EV charger grant for business: what's open and what's closed
The only government EV charger grant open to businesses in 2026 is the Workplace Charging Scheme: up to £500 per socket, 75% of costs, 40 sockets, until 31 March 2027. You need a voucher before any work starts, an OZEV-authorised installer, and chargers from the approved commercial model list. State-funded schools can get up to £2,000 per socket.
The EV infrastructure grant for staff and fleets and the commercial landlord chargepoint grant both closed to applications on 31 March 2026. The residential landlord infrastructure grant closed too. Landlords with residential car parks can still use the residential landlord chargepoint grant: see EV grants for landlords.
For every other funding route, from tax allowances to regional loans, see business energy grants.
From enquiry to switch-on
- Tell us about the site: vehicles, parking, who'll charge and your supply.
- Survey: supply capacity, cable routes, groundworks and bay layout.
- Design and quote: charger types, load management, software, grant deduction and any DNO work.
- Apply for the WCS voucher before anything is installed. Vouchers last 180 days.
- Install and commission: to BS 7671 and the IET Code of Practice, with an Electrical Installation Certificate.
- Go live: set up access, tariffs and reporting, and the installer claims the grant.
What to ask commercial EV installers
- Are you OZEV-authorised for commercial chargepoints, and is every model on the approved list?
- What's my maximum import capacity, and how many sockets fit with load management?
- Is a DNO application needed, and who handles it?
- What are the software, data and maintenance fees per charger per year, and what's the contract length?
- Will you duct extra bays now so we can add chargers later without more groundworks?
- If the public can use them, who acts as the charge point operator under the 2023 Regulations?
We pass your enquiry to one commercial installer. No ring-rounds, no lists, and your details aren't sold on.
Sources checked 28 October 2026
- GOV.UK: Electric vehicle chargepoint grants (updated 1 Apr 2026)
- GOV.UK: Changes to chargepoint grant schemes from 1 April 2026 (updated 7 Jul 2026)
- GOV.UK: Workplace Charging Scheme for state-funded education institutions
- GOV.UK Find a grant: Workplace Charging Scheme, applicant guidance (closing date 31 March 2027)
- GOV.UK: Workplace Charging Scheme guidance for installers (updated 1 Apr 2026)
- GOV.UK: Commercial chargepoints minimum technical specification (updated 30 Apr 2025)
- The Public Charge Point Regulations 2023 (SI 2023/1168)
- HMRC Capital Allowances Manual CA23156: 100% first-year allowance for EV charging points (updated 13 Apr 2026)
- HMRC 480 Chapter 13: exemption for workplace charging (para 13.15)
- Valuation for Rating (Plant and Machinery) (England) (Amendment) Regulations 2022 (SI 2022/405)
- HMRC VAT Notice 708/6: energy-saving materials
Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.