Commercial heat pumps 2026

Commercial heat pumps: £7,500 grant for smaller business buildings, costs and quotes

Most business owners think the Boiler Upgrade Scheme is for homes. It isn't only for homes. GOV.UK says the grant can replace the heating in "a building used for your business", and it pays £7,500 towards an air or ground source heat pump, or £9,000 until March 2027 if the building runs on oil or LPG with no mains gas. Fewer than 1% of the heat pump grants paid so far have gone to non-domestic buildings. Here's who qualifies, what bigger systems involve, what heat pumps really cost and how to get one quoted.

Updated 28 October 2026 · Independent guide, not the government's Great British Energy (gbe.gov.uk) · Checked against GOV.UK, Ofgem and scheme sources

£7,500Boiler Upgrade Scheme grant, air or ground source
£9,000Off-gas sites leaving oil or LPG, until March 2027
45kWthGrant limit for one heat pump (70kWth for several)
To 2030Boiler Upgrade Scheme extended
0.6%Share of BUS grants paid so far to non-domestic buildings
Business, farm, school or charity? You're in the right place. Looking for a heat pump for your home? Home heat pumps →

Commercial heat pumps: key facts for 2026

The grantThe Boiler Upgrade Scheme isn't just for homes. It pays £7,500 towards an air or ground source heat pump in a small non-domestic building, for systems up to 45kWth (70kWth with more than one heat pump). Until March 2027, a building heated by oil or LPG with no mains gas connection can get an extra £1,500, so £9,000 in total. The scheme now runs to 2030.
Size limitsThe grant covers individual systems up to 45kWth, up to 70kWth where a heat pump is installed with one or more additional heat pumps, and up to 300kWth on shared ground loops. Above that, there's no BUS grant.
WhereThe Boiler Upgrade Scheme covers England and Wales. In Scotland, Business Energy Scotland's SME Loan offers cashback of up to £10,000 on heat pumps. Northern Ireland's scheme has closed.
Public sectorThe Public Sector Decarbonisation Scheme closed to applications in November 2024 and no new phase has been announced. The government's own Great British Energy solar programme for schools and NHS sites works with sites the government selects, and gbe.gov.uk lists no application route (checked 28 October 2026).
TaxHMRC treats a space or water heating system as an integral feature, which is special-rate plant. The Annual Investment Allowance can cover it. Ask your accountant how it applies to your project.
Business ratesEngland's 2022 rating change covers renewable power generation and storage plant. Heating plant that serves your building is treated separately and wasn't changed, so a heat pump that heats your premises may still be rateable. Ask a rating adviser.

Boiler Upgrade Scheme for business: the £7,500 grant

The Boiler Upgrade Scheme (BUS) is run by Ofgem and pays a fixed grant towards replacing fossil fuel heating with a low-carbon system. GOV.UK says it can replace the heating system in your home or a building used for your business, and the regulations extending it to 2030 refer to homes and small non-domestic properties.

TechnologyBUS grantOff-gas top-up (until March 2027)
Air source heat pump (air-to-water)£7,500+£1,500 if heated by oil or LPG with no mains gas: £9,000
Ground source heat pump (including water source and shared ground loops)£7,500+£1,500 on the same terms: £9,000
Air-to-air heat pump£2,500 for homes only. Not available for non-residential buildingsNot available
Biomass boiler£5,000 (rural, off-gas properties only)Not listed
Hybrid (gas boiler plus heat pump)Not eligibleNot eligible

Who qualifies

  • You own the building. GOV.UK says this includes a business property or one you let to tenants.
  • You're replacing fossil fuel heating: gas, oil, LPG or electric. You can't get a grant to replace an existing low-carbon system.
  • England or Wales. The scheme doesn't cover Scotland or Northern Ireland.
  • One grant per property, and not if the building has already had government funding for a heat pump or biomass boiler.
  • Not most new builds or social housing.

Shops, offices, surgeries, workshops, farm buildings, village halls and smaller hotels or care homes are the kind of buildings that can fit within the size limits. For the off-gas top-up in detail, see heat pump grants for oil and LPG.

Size limits: 45kWth, 70kWth and 300kWth

This is where commercial heat pumps differ from home installs. The BUS caps the capacity of the system, measured in kilowatts thermal (kWth):

SystemMaximum capacity for the grantTypical commercial fit
Individual heat pump45kWthSmall offices, shops, surgeries, chapels, village halls, small workshops
Heat pump plus one or more additional heat pumps70kWthLarger offices, small hotels, care homes, school blocks: two or more units in a cascade
Shared ground loop300kWthSeveral buildings or units sharing boreholes or a ground array
Above these limitsNo BUS grantFactories, warehouses, leisure centres, large estates: funded through tax allowances, loans or third-party finance

A cascade links several heat pumps so they run as one system. It gives resilience (one unit can fail without losing all heat) and lets units step up and down with demand, which suits buildings with big swings in load. It also means a larger building can sometimes stay within the 70kWth limit with a well-insulated fabric and good controls.

How much does a commercial heat pump cost?

The only official national cost figures come from DESNZ's Boiler Upgrade Scheme statistics, built from MCS installation certificates. For April to June 2026:

TechnologyMedian installed cost (2026 Q2)Middle half of installsMedian capacity
Air source (air-to-water)£12,908£11,128 to £15,6278kW
Ground source£27,232£18,136 to £42,11010.5kW

Read this carefully: these are domestic-dominated figures. Over 99% of the BUS grants paid so far went to homes, and the median system is 8kW. The costs are self-reported by MCS installers and include the equipment, labour and VAT. They should include the grant value (DESNZ notes installers may interpret this differently), so treat them as before the £7,500 comes off. A commercial system at 30kW, 45kWth or a 70kWth cascade will cost more, and it is priced on survey.

What drives a commercial heat pump quote:

  • Heat demand: the peak heat loss of the building sets the capacity, and capacity drives cost.
  • Emitters: heat pumps run most efficiently at lower flow temperatures. Undersized radiators or old fan coils may need replacing.
  • Hot water: the size of the cylinder or thermal store and how much hot water you use.
  • Ground works: boreholes or trenches for ground source systems.
  • Electrical supply: larger units may need a three-phase supply or a capacity upgrade.
  • Controls and monitoring: building management system integration and metering.

Ordinary business premises pay 20% VAT on heat pumps, which VAT-registered businesses can normally reclaim. Buildings used solely for a relevant charitable purpose can get 0% until 31 March 2027. For home heat pump costs, see our heat pump cost guide.

Sizing: why a heat-loss survey comes first

An oversized heat pump costs more and can short-cycle. An undersized one won't hold temperature on the coldest days. Commercial buildings vary far more than homes, so the survey matters more:

  • Room-by-room heat-loss calculation using the fabric, glazing, ventilation and occupancy, not the size of the old boiler.
  • Metered gas or oil use from 12 months of bills, as a reality check on the calculation.
  • Occupancy patterns: an office empty at weekends, a care home occupied 24/7 and a church used twice a week need very different control strategies.
  • Fabric first: insulation, draught-proofing and controls can bring a building under the 45kWth or 70kWth limit and cut running costs.
  • Plant space and noise: where the outdoor units go, and planning or neighbour considerations.

Hot water loads: hospitality, care homes and leisure

In hotels, pubs, restaurants, care homes, gyms and sports clubs, hot water can be as big a load as space heating. It peaks at predictable times: morning showers, kitchen service, laundry. That changes the design:

  • Storage over instant output: larger cylinders or thermal stores, charged ahead of the peak, let a smaller heat pump meet a big demand.
  • Legionella control: stored hot water has to be managed under HSE guidance. Ask how the design achieves safe storage temperatures, whether by a high-temperature heat pump, a booster or an immersion cycle, and what that does to running costs.
  • Kitchen and laundry: heat recovery from cold rooms, extract air or laundry waste water can feed the heat pump.
  • Care settings: continuous occupancy means steady loads, which suit heat pumps well, but there's no tolerance for downtime. A cascade with redundancy is worth the extra cost.

Heat pump grants for business by nation, and for the public sector

Where / whoWhat's availableStatus
England and Wales: small business buildingsBoiler Upgrade Scheme: £7,500 ASHP or GSHP; £9,000 off oil or LPGOpen, extended to 2030; top-up until March 2027
Scotland: SMEsBusiness Energy Scotland's SME Loan lends £1,000 to £130,000 interest-free, with cashback of up to £20,000 on energy-efficiency work and £10,000 on heat pumps. It is not taking new applications for solar PV.Open for heat pumps
Wales: businessesThe Development Bank of Wales Green Business Loan Scheme lends £1,000 to £1.5 million over up to 15 years, at a discounted rate and with no arrangement fee, for projects including solar PV and heat pumps. It also offers an energy audit grant of up to £10,000.Open, alongside the BUS
Public sectorPublic Sector Decarbonisation SchemeClosed since November 2024; no new phase announced
Northern IrelandBoiler Replacement SchemeClosed

Heat pump grants for the public sector: with PSDS closed, public bodies should check with Ofgem whether a smaller building fits the BUS, and fund larger estates from capital budgets, the tax allowances below or third-party finance. Schools and councils will find the wider picture on business energy grants.

Larger systems above 45kWth: tax allowances, rates and EPCs

For factories, warehouses, leisure centres and multi-building estates, the BUS won't apply. The money comes from elsewhere:

  • Capital allowances. HMRC lists "a space or water heating system" as an integral feature of a building (CA22320), and integral features are special-rate expenditure. The Annual Investment Allowance (£1 million a year) can be used against them, and companies can claim the 50% first-year allowance on new special-rate assets above that. Full expensing covers main-rate plant only. How your heat pump system is split between heating plant and other items is a question for your accountant.
  • Business rates. England's 2022 rating change covers renewable power generation and storage plant. Heating plant that serves your building is treated separately and wasn't changed, so a heat pump that heats your premises may still be rateable. Ask a rating adviser.
  • EPC and MEES. Since 1 April 2023 you can't keep letting a commercial property in England or Wales rated below EPC E unless you register an exemption. In June 2026 the government dropped the planned EPC C by 2027 step. It now proposes EPC B from 2031 for buildings over 1,000 square metres, where cost-effective. A heat pump can lift a rating, especially in a building heated by oil or direct electric. Get an EPC assessor to model it before you buy: see MEES and commercial EPCs.
  • Solar to run it. A heat pump adds electrical load, so a solar roof pays back faster. See commercial solar panels and battery storage.

How to get a commercial heat pump quoted

  1. Tell us about the building: floor area, how it's heated now, fuel bills and opening hours.
  2. Heat-loss survey: room by room, plus hot water demand and plant location.
  3. Design and quote: capacity, single unit or cascade, emitters, controls and the grant position.
  4. Grant application: for systems within the limits, the MCS-certified installer applies to Ofgem on your behalf. Ofgem contacts you to confirm. The grant comes off your invoice.
  5. Install and commission within 120 days of the grant application, or the installation won't be eligible.
  6. Handover: controls set-up, metering and a maintenance plan.

What to ask heat pump installers

  • Are you MCS certified for this technology and size, and have you done commercial buildings like mine?
  • What peak heat loss did you calculate, and how?
  • Single unit or cascade, and does it stay inside the 45kWth or 70kWth grant limit?
  • What flow temperature does the design run at, and which emitters need changing?
  • How is hot water handled, including legionella control?
  • Does the site need a supply upgrade, and who handles it?

We pass your enquiry to one suitable installer that does commercial heat pump work.

Sources checked 28 October 2026

Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.

Commercial heat pump questions

Can a business get the Boiler Upgrade Scheme grant?

Yes. GOV.UK says the grant can replace the heating system in a building used for your business, in England and Wales. You must own the building and be replacing fossil fuel heating. It pays £7,500 towards an air or ground source heat pump, within the size limits.

What size of commercial heat pump does the BUS cover?

Up to 45kWth for an individual system, 70kWth where a heat pump is installed with one or more additional heat pumps, and 300kWth for shared ground loops. Larger systems don't get a BUS grant.

How much does a commercial heat pump cost?

There's no official figure for commercial systems. DESNZ's Boiler Upgrade Scheme statistics show a median of £12,908 for air source and £27,232 for ground source installs in April to June 2026, including VAT and before the grant, but these are mostly homes with a median size of 8kW. Commercial systems are priced on survey.

Are there heat pump grants for the public sector?

The Public Sector Decarbonisation Scheme closed to applications in November 2024 and no new phase has been announced. Smaller public buildings should ask Ofgem whether they fit the Boiler Upgrade Scheme.

Is there a business heat pump grant in Scotland?

The Boiler Upgrade Scheme doesn't cover Scotland. Business Energy Scotland's SME Loan lends £1,000 to £130,000 interest-free, with cashback of up to £10,000 on heat pumps.

Can I claim a commercial heat pump against tax?

Usually, yes. HMRC treats a space or water heating system as an integral feature, which is special-rate plant. The Annual Investment Allowance can cover it, and companies can claim the 50% first-year allowance above that. Check the details with your accountant.

Do I get £9,000 if my business is on oil or LPG?

Until March 2027, yes, if the building is heated by oil or LPG and has no mains gas connection. You get an extra £1,500 on top of the £7,500 for an air or ground source heat pump.