Church grants & heating 2026

Grants for churches in 2026: what replaced the Listed Places of Worship scheme, and how to fund heating and solar

The Listed Places of Worship Grant Scheme is closed, and GOV.UK says there will be no further funding rounds. In England it has been replaced by the £92 million Places of Worship Renewal Fund, run by Historic England, which works very differently. Meanwhile the Boiler Upgrade Scheme lists churches as eligible buildings, the Church of England has its own net zero grants, and heat pumps and solar can be zero-rated for VAT until March 2027. Here is every real grant for churches in 2026, what each one will and won't pay for, how to plan church heating, and how to get a church heating or solar project quoted.

Updated 29 October 2026 · Independent guide, not the government's Great British Energy (gbe.gov.uk) · Checked against GOV.UK, Ofgem and scheme sources

ClosedListed Places of Worship Grant Scheme: no further rounds (GOV.UK)
£92mPlaces of Worship Renewal Fund for England, over four years
£10k-£1mRenewal Fund grants for listed places of worship
£7,500Boiler Upgrade Scheme heat pump grant; Ofgem lists churches as eligible
0% VATHeat pumps and solar for buildings used solely for charitable purposes, to 31 March 2027
Business, farm, school or charity? You're in the right place. Looking at heating or solar for your own home or vicarage? Home energy grants →

Church energy grants: key facts for 2026

LPWGSThe Listed Places of Worship Grant Scheme is closed. All decisions within its £23 million 2025-26 budget were finalised, and GOV.UK says there will be no further funding rounds.
What replaced it (England)The Places of Worship Renewal Fund, run by Historic England: £92 million over four years, grants of £10,000 to £1 million for repairs to listed places of worship, aimed at areas of high deprivation. It can include unreclaimable VAT on eligible works.
HeatingThe Boiler Upgrade Scheme pays £7,500 towards an air or ground source heat pump, £9,000 off the gas grid until 31 March 2027. Ofgem's guidance names churches as eligible non-residential properties.
Church of EnglandThe Net Zero Carbon Programme offers Quick Wins grants of up to £10,000 through dioceses, Give to Go Green match funding, and the Decarbonising Churches Grant Fund, open to all dioceses since June 2026.
VATSolar panels, heat pumps and insulation can be zero-rated until 31 March 2027 if the building is used entirely for charitable, non-business purposes. Ordinary business premises pay 20%.
Community energyThe government's GBE Community Fund (gbe.gov.uk, which is not us) backs community-owned energy projects. Its current window closes on 12 November 2026 at 11:55pm.

Listed Places of Worship Grant Scheme: closed, and what replaced it

For years the Listed Places of Worship Grant Scheme (LPWGS) refunded VAT on repairs to listed places of worship. The House of Commons Library notes it provided VAT relief but didn't make grants. It is now closed. GOV.UK says the scheme "is no longer accepting applications from new or returning applicants", that all award decisions within the £23 million 2025-26 budget have been finalised, and that "there will be no further funding rounds".

England: the Places of Worship Renewal Fund

The replacement in England is the Places of Worship Renewal Fund (PWRF), funded by DCMS and delivered by Historic England. It's a capital grant scheme, not a VAT refund:

FeaturePlaces of Worship Renewal Fund
Budget£92 million over four years: £23 million a year
Grant size£10,000 to £1,000,000. Nothing under £10,000
Who can applyListed places of worship in England (Grade I, II* or II) of any faith, still in active use. Unlisted buildings aren't eligible
PriorityAreas of high deprivation, where fundraising is hardest
What it pays forUrgent repairs and essential improvements that keep buildings safe, open and in use
VATNo separate VAT rebate, but VAT on eligible works counts as a cost where you can't reclaim it
How to applyAn expression of interest in set windows, then a full application if invited

Can it pay for heating or solar? Only as a small part of a repair project. Historic England says grants can't be awarded for improvements and alterations alone. Its own examples of improvements that can sit inside a repair application include "new or improved heating to combat damp issues" and "the strengthening of roof structures to allow the fitting of solar panels". Energy audits can be included as project development costs.

Timing: both 2026 expression of interest rounds have closed (the second closed on 2 October 2026). In year one only, projects that started on or after 1 October 2025, finished or are due to finish by 30 September 2026, and lost expected match funding can apply for £10,000 to £50,000 by 31 December 2026. Watch Historic England for the next window.

Scotland, Wales and Northern Ireland

  • Scotland: Historic Environment Scotland runs the Scotland's Places of Worship Fund, a pilot worth up to £1 million that refunds VAT on eligible repair, maintenance and conservation work to listed places of worship. It's first come, first served and open until 31 March 2027 or until the money runs out.
  • Northern Ireland: the National Churches Trust runs repair grants of up to £50,000 for listed places of worship, funded by the Department for Communities.
  • UK-wide: GOV.UK points places of worship to the National Lottery Heritage Fund, which funds all types of heritage project.

Grants for churches in 2026: who funds what

FunderWhat it offersHeating or solar?Status (29 October 2026)
Places of Worship Renewal Fund (Historic England, England)£10,000 to £1 million for repairs to listed places of worshipOnly as a small part of a repair project2026 rounds closed; year-one retrospective route to 31 December 2026
National Churches TrustMedium Grants (average £6,000) for repairs up to £80,000; Large Grants (average £21,000) for bigger repairs and kitchens or toiletsNo: it doesn't fund "works purely for heating, lighting and reseating"Large Grants next deadline 3 November; Medium Grants 15 December
Church of England Quick WinsUp to £10,000, generally £3,000 to £5,000, through your dioceseYes: LED lighting, pew heaters, insulation, electric supply upgradesAsk your diocese's Net Zero Carbon Officer
Church of England Give to Go GreenMatch funding that doubles locally raised donations for carbon-cutting projectsYesRound three applications 5 October to 11 January
Decarbonising Churches Grant Fund (Church of England)Larger support for planning and capital worksYesOpened to churches in all dioceses from June 2026
Boiler Upgrade Scheme (Ofgem)£7,500 off an air or ground source heat pump; £9,000 off-gas until 31 March 2027Heat pumpsOpen, England and Wales, scheme extended to 2030
GBE Community Fund (the government's Great British Energy, not us)Feasibility, development and capital grants for community-owned energySolar and other community energyWindow closes 12 November 2026, 11:55pm
National Lottery Heritage FundHeritage project grants, UK-wideCan be part of a wider heritage projectCheck the fund's current programmes

The Church of England's grants are for its own parishes. Other denominations should ask their own national or regional bodies, and every church can approach charitable trusts. Speak to your Net Zero Carbon Officer or Diocesan Environment Officer before applying to any Church of England fund.

Church heating: heat the people, not the building

Church heating is the biggest energy cost for most churches and the hardest to get right. The Church of England's heating guidance says its principles "start with people, not technology", and it asks five questions first: who are you heating, what happens in the building, when and for how long, where in the building, and which areas or objects need special care?

ApproachWhat it doesSuits
People heating (pew heaters, infrared panels)Warms the people where they sit, not the air in a tall naveChurches used a few times a week; large, high-ceilinged buildings
Space heating (radiators, underfloor, warm air)Warms the whole buildingSmaller churches and halls used most days
Background or conservation heatingKeeps a low, steady temperature or controls humidity to protect fabric and contentsBuildings with sensitive interiors, organs or artworks
Winter zonesHeats a smaller part of the church in the coldest monthsChurches with a side chapel or partitioned area
Heat pumpsLow-carbon heat for wet systems or warm air, run on electricityBuildings with regular use, good controls, and fabric work done first
  • Fix the fabric first. The guidance says repairing roofs and gutters, draught-proofing doors and windows and insulating pipes makes a building warmer and drier and cuts the heat needed.
  • Protect historic interiors. Rapid swings in temperature or humidity can damage timber, organs and decoration. Get expert advice before changing how a historic church is heated.
  • Plan the switch. The guidance calls electric heating powered by renewable energy a key long-term goal, but says change may need to be gradual, using zoning and hybrid set-ups on the way.
  • Don't wait for hydrogen. The Church Buildings Council concludes hydrogen is "not likely to be practically and economically viable" for heating churches in the short and medium term, and says a "hydrogen-ready" boiler won't make a meaningful contribution to net zero.

For larger halls and multi-building sites, see commercial heat pumps. For heating at the vicarage or your own home, see heat pumps for homes.

Church heating grants: the Boiler Upgrade Scheme for church buildings

The main national church heating grant is the Boiler Upgrade Scheme (BUS). Ofgem's installer guidance for applications from 28 April 2026 says non-residential properties are eligible for air-to-water and ground source heat pumps, and gives "churches, community centres, and office spaces" as examples. Its property owner guidance says churches "may be eligible, subject to meeting wider eligibility requirements".

  • The grant: The Boiler Upgrade Scheme isn't just for homes. It pays £7,500 towards an air or ground source heat pump in a small non-domestic building, for systems up to 45kWth (70kWth with more than one heat pump). Until March 2027, a building heated by oil or LPG with no mains gas connection can get an extra £1,500, so £9,000 in total. The scheme now runs to 2030.
  • Not air-to-air: air-to-air heat pumps are for residential properties only, so they can't get a BUS grant in a church.
  • What's being replaced: fossil fuel heating (gas, oil, LPG) or electric heating, but not an existing heat pump.
  • Who signs: the BUS is installer-led. Where the building is owned by an organisation that isn't on Companies House, Ofgem needs a letter of authorisation: a trustee signs for a charity, and the religious leader of the place of worship signs where the church isn't a company or charity. For a Church of England parish, check with your diocese who holds the property.
  • Where: England and Wales only.

Will a heat pump work in your church? Heat pumps work best running steadily at low temperatures. A church heated for two hours on a Sunday may be better served by people heating, while a church with a hall, a weekday café or a nursery may suit a heat pump well. A good installer will model your actual use before recommending one.

Buildings registered for public religious worship and church halls are exempt from business rates, so rates don't come into the decision. For the scheme in detail, see our Boiler Upgrade Scheme guide.

Faculty, List A and List B: consents for church heating and solar

In the Church of England, most changes to a church need a faculty from the diocese. Since 1 July 2022, the Faculty Jurisdiction Rules have made some low-carbon work simpler and require every proposal to show it has had due regard to the Church Buildings Council's net zero guidance.

WorkRoute under the 2022 rules
Solar panels on a church that isn't listed or in a conservation areaList B: no faculty, but you need the archdeacon's written notice
Solar panels on a listed church, or one in a conservation areaFaculty
Electric heaters attached to pews made in or after 1850List B
Like-for-like boiler (gas for gas, oil for oil)Needs permission: the Church of England says the 2022 rules require it for any gas-for-gas or oil-for-oil replacement
Heat pumpsThe boiler entry in the lists excludes heat pumps, so expect to need a faculty. Ask your DAC early
EV charging upstand in the churchyard or curtilageList A, subject to conditions

A faculty application for solar or a heat pump will usually need a statement of significance, a statement of needs, drawings and technical specifications, and for roof-mounted solar an engineering statement on the weight of the array and wind loading. The ecclesiastical exemption covers listed building control, not planning: the Church of England is clear it isn't exempt from planning permission or building regulations.

Other denominations with the ecclesiastical exemption run their own consent systems, and places of worship of other faiths use the normal listed building and planning route. Our charity and church solar guide explains the exemption in detail.

Solar panels for churches: funding and fit

Solar works best on a church that uses power through the week: a hall, an office, a café, a heat pump or a nursery. A church used mainly on Sundays exports much of its weekday output, so it earns Smart Export Guarantee payments rather than saving on bills.

  • Pair solar with the heating plan. A heat pump or electric pew heaters add electrical load, which a solar roof can offset. Plan them together.
  • Hidden roofs first. A south-facing aisle roof, a hall or a vestry is usually easier to get approved than the main nave.
  • Fund it locally. Give to Go Green match funding, community share offers and charitable trusts are the usual routes. The Renewal Fund only helps with structural work to take panels as part of a repair project.
  • Cost: DESNZ's official data puts 10-50kW solar at a median £1,262/kW installed (2025/26), including VAT where it applies. Church roofs, access, scaffolding and fixings for slate or lead often push costs up, so get a survey-based quote.

For the full church and charity solar guide, including the 0% VAT test and community energy, see charity solar panel grants.

0% VAT on church heat pumps, solar and insulation until March 2027

Most churches aren't VAT-registered, so VAT is a real cost. The Church of England's VAT guidance says a temporary zero rate applies to energy-saving materials "such as solar panels, heat pumps, and insulation, until 31 March 2027, provided the building is used entirely for charitable, non-business purposes".

  • Business use matters. Where business use such as commercial lettings or a café is more than incidental, relief may be restricted or lost.
  • Keep contracts separate. The guidance warns against combining energy-saving work with general repairs in one contract, which could make the standard rate apply to the whole project.
  • Agree it before work starts. The Church of England says contractors must have the appropriate certification before applying the zero rate, and this should be agreed before work begins.
  • After March 2027: HMRC's VAT Notice 708/6 sets 0% until 31 March 2027, then 5%. Projects that complete before then get the full saving.

Ordinary business premises pay 20% VAT on solar, batteries and heat pumps, which VAT-registered businesses can normally reclaim. The 0% rate is only for homes and buildings used solely for a relevant charitable purpose, and it runs to 31 March 2027. For the qualifying test in detail, see VAT relief on energy-saving materials.

The GBE Community Fund: the government's company, not us

Great British Energy, the government's publicly owned energy company (gbe.gov.uk), runs the GBE Community Fund. We are an independent guide with a similar name. We are not Great British Energy and we don't run or assess this fund.

  • Who: legally constituted, incorporated community organisations in England, Wales or Northern Ireland, including registered charities, community benefit societies and community interest companies. Scotland is supported separately through Local Energy Scotland's CARES programmes.
  • Stages: feasibility up to £40,000, development up to £100,000, and capital up to £3 million or 50% of project costs, from a £20 million fund.
  • Ownership: projects must be at least 50% community owned when operating.
  • Window: closes on 12 November 2026 at 11:55pm.

A church may be able to host a community-owned solar scheme on its roof or land, with a community energy group as the applicant. Check the full guidance on gbe.gov.uk before you apply.

How to get a church heating or solar project quoted

Before you ask for quotes

  • Twelve months of gas, oil and electricity bills, and a note of when the building is actually used each week.
  • Your quinquennial inspection report and any condition survey.
  • The listing grade, whether you're in a conservation area, and who owns the building.
  • A conversation with your DAC, archdeacon or Net Zero Carbon Officer (Church of England), or your denomination's buildings team.
  • Any grant timetable you're working to, and the VAT position.

Questions to ask every installer

  • Have you worked on churches like ours, including listed ones?
  • Have you modelled our real pattern of use, and why this heating approach?
  • Are you MCS certified for the heat pump or solar system, so the BUS grant and export payments are available?
  • Will you supply the specifications and engineering information our faculty or planning application needs?
  • How do you protect historic fabric, organs and interiors during work?
  1. Send us the basics using the form. It takes two minutes.
  2. One suitable installer contacts you for a survey. You won't be passed round a list.
  3. Options and quote you can take to the PCC or trustees and your DAC.
  4. Consents and grants: faculty or planning, BUS application through the installer, and any other funding.
  5. Install and commission, around services, weddings and funerals.

Sources checked 29 October 2026

Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.

Church energy grant questions

Is the Listed Places of Worship Grant Scheme still open?

No. GOV.UK says the scheme is no longer accepting applications, that all decisions within its £23 million 2025-26 budget have been made, and that there will be no further funding rounds. In England it has been replaced by the Places of Worship Renewal Fund, run by Historic England.

What replaced the Listed Places of Worship Grant Scheme?

In England, the Places of Worship Renewal Fund: £92 million over four years, with grants of £10,000 to £1 million for repairs to Grade I, II* and II listed places of worship, prioritising areas of high deprivation. In Scotland, Historic Environment Scotland runs a pilot VAT refund fund, Scotland's Places of Worship Fund, until 31 March 2027.

Are there grants for church heating?

Yes. The Boiler Upgrade Scheme pays £7,500 towards an air or ground source heat pump (£9,000 off the gas grid until 31 March 2027), and Ofgem's guidance names churches as eligible. Church of England parishes can also apply for Quick Wins grants of up to £10,000 through their diocese, for things like pew heaters and insulation. The National Churches Trust doesn't fund heating-only work.

Can a church get the Boiler Upgrade Scheme grant?

It can. Ofgem's installer guidance lists churches as an example of eligible non-residential properties for air-to-water and ground source heat pumps, in England and Wales. The church must be replacing fossil fuel or electric heating, and an MCS-certified installer applies on its behalf. Air-to-air heat pumps aren't eligible for non-residential buildings.

Do churches pay VAT on solar panels and heat pumps?

Not if the building is used entirely for charitable, non-business purposes: energy-saving materials such as solar panels, heat pumps and insulation are zero-rated until 31 March 2027. Keep this work in a separate contract from general repairs, and agree the VAT position with the installer before work starts.

Do we need a faculty for solar panels on a church?

For a Church of England church, solar panels on a building that isn't listed or in a conservation area are List B: you need the archdeacon's written notice rather than a full faculty. A listed church, or one in a conservation area, needs a faculty. Planning permission may also be needed.

Can a church apply to the GBE Community Fund?

The fund is run by the government's company Great British Energy (gbe.gov.uk), not by us. It's for incorporated community organisations, including registered charities, and projects must be at least 50% community owned. Many churches host a scheme run by a community energy group. The current window closes on 12 November 2026 at 11:55pm.

Get your site quoted properly

Two minutes now saves weeks of ring-rounds. Tell us about your site and we will introduce one suitable installer.

Get a free church heating or solar quote →
Get a free church heating or solar quote →