What is an industrial heat pump? High temperature heat pumps explained
A heat pump doesn't make heat by burning anything. It moves heat from a cooler source to a hotter one, using electricity to drive a compressor. That's why a well-designed heat pump can deliver more heat than the electricity it uses. The colder the source and the hotter the output you need, the harder it works, so the design always starts with two numbers: where the heat comes from, and how hot it has to be.
| Type | Heat source | Where it fits |
|---|---|---|
| Commercial air source heat pump | Outside air | Space heating and hot water for offices, warehouses, depots and large sheds. Often several units in a cascade. |
| Commercial ground or water source heat pump | Boreholes, ground arrays, rivers, lakes or mine water | Large estates and sites with land or water nearby. Steadier source temperatures than air. |
| Heat recovery heat pump | Waste heat on site: cooling water, compressed air plant, refrigeration, chillers, extract air, effluent | Sites that throw away warm water or air while buying gas for heat. Often the best economics, because the source is warm and free. |
| High temperature heat pump | Usually recovered waste heat | Process hot water, washdown, cleaning-in-place, pasteurising, drying and, with steam compression stages, some low-pressure steam duties. |
Get the duty point in writing. Every supplier quotes performance at a stated source temperature and output temperature. Ask for the efficiency at your source and your required temperature, across the year, not the best-case figure on the datasheet.
Heating a smaller building rather than a process? Our commercial heat pumps guide covers the £7,500 grant for business buildings, and home heat pumps covers houses.
Industrial heat pumps: key facts for 2026
Process heat, heat recovery and steam: where industrial heat pumps work
Industrial heat pumps earn their keep where a site needs a lot of heat at a steady rate, and especially where it already rejects warm water or air. Typical fits:
| Sector | Heat duties | Waste heat to recover |
|---|---|---|
| Food and drink | Washdown, cleaning-in-place, pasteurising, cooking water, space heating | Refrigeration and chiller condensers, cooling water |
| Breweries and distilleries | Mashing, wort and spirit heating, cleaning | Cooling water, condenser heat, effluent |
| Industrial laundries | Wash water, drying | Warm effluent, dryer exhaust |
| Manufacturing and engineering | Parts washing, paint shops, curing and drying ovens, space heating of large halls | Compressed air plant, process cooling, extract air |
| Controlled-environment growing | Glasshouse and vertical farm heating | Cooling and dehumidification loads |
| Data centres and cold stores | Heat exporters rather than users | Server or refrigeration heat, which can be upgraded and sold to a neighbour or a heat network |
What about steam?
Many sites run a steam boiler because steam was the easiest way to move heat around, not because every user needs steam. A good assessment splits the load: which users genuinely need steam, and which could take hot water instead. Hot water duties are usually where a heat pump fits first. Genuine steam duties are possible with high temperature heat pumps and steam compression, but they're a specialist design, so expect a feasibility study before a fixed quote.
Keep the boiler, at first
Plenty of sites start with a heat pump that recovers waste heat to pre-heat boiler feed or process water, with the existing boiler topping up. It cuts gas use without betting the production line on new kit, and the metering data then sizes the next step.
Above the BUS limits: why the £7,500 grant doesn't cover industrial heat
The Boiler Upgrade Scheme does pay towards heat pumps in business buildings, but its regulations were written for homes and small non-domestic properties. Three rules rule out most industrial jobs:
- Capacity caps. No more than 45kWth for one heat pump, 70kWth combined where heat pumps are installed together, or 300kWth on a shared ground loop.
- Space heating first. The heat pump has to be capable of meeting the building's full space heating demand.
- No process heat. The regulations define the hot water they count as water for the personal use of the people in the building. They expressly exclude hot water used for heating a swimming pool or "carrying out a process".
So a heat pump that heats a factory office block might fit the scheme. One that heats a production process won't. For the buildings that do fit, see commercial heat pumps and the £7,500 grant and the Boiler Upgrade Scheme guide.
Industrial Energy Transformation Fund (IETF) 2026: closed, and what replaced it
For five years the Industrial Energy Transformation Fund was the main grant for industrial heat pumps, heat recovery and energy efficiency in England, Wales and Northern Ireland. It launched in 2020 with £500 million across three phases. That's over:
- Closed in July 2025. After the Spending Review, the government decided there would be no further extension. The planned second window of Phase 3 did not take place.
- No successor. GOV.UK's IETF page says plainly: "No successor fund is planned."
- Existing projects are safe. The 2024 Autumn Budget committed £163 million to finish all current projects from Phases 1 and 2 and the first Phase 3 window.
- Scotland: the Scottish Industrial Energy Transformation Fund (SIETF) lists all three of its calls as closed.
- Older schemes: the Industrial Heat Recovery Support programme closed to applications in July 2020.
What that means for your business case: an industrial heat pump in 2026 has to stand up on energy savings, tax relief and, for eligible manufacturers, cheaper electricity. Don't hold a project for an IETF round that isn't coming. The routes that are still live are in the next section.
Industrial heat pump funding still open in 2026
| Route | What it does | Status (checked 29 October 2026) |
|---|---|---|
| British Industrial Competitiveness Scheme (BICS) | Not a heat pump grant. From 2027 it cuts electricity costs by up to £40/MWh for eligible manufacturers by exempting them from Renewables Obligation, Feed-in Tariff and Capacity Market costs. Cheaper power makes electrified heat cheaper to run. Great Britain only; each site must use at least 33MWh of grid electricity a year; eligibility goes by SIC and product codes. | Open until 11:59pm on 30 November 2026. Relief from April 2027 (RO and FiT) and October 2027 (Capacity Market) |
| Green Heat Network Fund (GHNF) | Capital grants for new low-carbon heat networks and expanding existing ones, in England and Wales. Its scheme overview lists capturing waste heat from an industrial process as a supported heat source. Grants run up to, but not including, 50% of eligible costs; urban networks need at least 2GWh a year of customer demand. | Round 12 closed on 25 September 2026. GOV.UK hadn't announced the next round when we checked. |
| Heat Network Efficiency Scheme (HNES) | Grants to improve existing district and communal heating systems that perform poorly, in England and Wales. | Round 13 closed on 9 October 2026. Round 14 is expected to open on 30 November 2026, subject to budget. |
| Climate Change Agreements | Sites in a climate change agreement pay a reduced Climate Change Levy: a 92% discount on electricity and 89% on gas in 2026-27. | For eligible energy-intensive sectors |
| Wales: Development Bank of Wales | The Development Bank of Wales Green Business Loan Scheme lends £1,000 to £1.5 million over up to 15 years, at a discounted rate and with no arrangement fee, for projects including solar PV and heat pumps. It also offers an energy audit grant of up to £10,000. | Open |
| Scotland: Business Energy Scotland | Business Energy Scotland's SME Loan lends £1,000 to £130,000 interest-free, with cashback of up to £20,000 on energy-efficiency work and £10,000 on heat pumps. It is not taking new applications for solar PV. SMEs only. | Open for heat pumps |
| Industrial Energy Transformation Fund | Grants for industrial efficiency and decarbonisation | Closed July 2025; no successor planned |
A site with surplus heat it can't use itself may be able to sell it to a heat network. If a council or developer near you is planning one, talk to them early. Your waste heat could be the low-carbon source their GHNF bid needs. For the wider picture across every sector, see business energy grants.
Capital allowances for heating plant, the Climate Change Levy and business rates
Capital allowances (CA22320)
HMRC lists "a space or water heating system" as an integral feature of a building, and integral features are special-rate expenditure. In practice:
- The Annual Investment Allowance (£1 million a year) can be used on integral features, so the first £1 million of qualifying spend can come off taxable profits in year one.
- Above that, companies can claim the 50% first-year allowance on new, unused special-rate assets, with the rest going into the special-rate pool.
- Full expensing covers main-rate plant only, so it doesn't apply to an integral feature.
- Process plant: HMRC's manual says only the assets on its list are integral features. Whether a heat pump that serves a production process, rather than the building, is an integral feature or ordinary plant changes which allowances apply, so get your accountant to classify each part of the project before you order.
Climate Change Levy
Gas used to carry a lower Climate Change Levy rate than electricity. Since 1 April 2024 they've matched. From 1 April 2026 both pay 0.801p per kWh, rising to 0.827p from 1 April 2027. If a heat pump cuts the kWh you buy, the levy falls with it.
Business rates
England's 2022 rating change takes renewable power generation and storage plant out of rateable value. Heating plant that serves your premises is treated separately and wasn't changed, so a heat pump may still be rateable. Ask a rating adviser. On-site factory solar panels to power it are covered by the exemption. See solar panels and capital allowances for how solar is taxed.
Before you buy: heat audit, power supply and the feasibility study
Industrial heat pumps are bespoke. The projects that work start with data, not a product:
- Heat audit. Meter or log every heat user: temperature, flow, hours and season. It shows which loads genuinely need steam and which could run on hot water.
- Waste heat map. Log every source of rejected heat: chillers, compressors, cooling towers, effluent, extract air. Match sources to users by temperature and timing.
- Hot water vs steam split. Move what you can to hot water. That's where a heat pump fits first.
- Thermal storage. A buffer tank lets a smaller heat pump run steadily and meet batch peaks.
- Electrical capacity. A large heat pump is a large new electrical load. Check your supply capacity early and ask the distribution network operator about an upgrade if needed. It can take months.
- Feasibility study. For bigger projects, a paid study with an investment-grade design avoids buying the wrong machine.
Large companies in the Energy Savings Opportunity Scheme already have audit data that can feed this. Pair the heat pump with on-site generation: a solar PPA or battery storage can cut the cost of each kWh it runs on.
How to get an industrial heat pump quoted
What to send
- Twelve months of gas, oil or LPG and electricity data, half-hourly if you have it.
- A list of heat users, with required temperatures and operating hours.
- Known waste heat sources: chillers, compressors, cooling water, effluent.
- Your supply capacity and any planned production changes.
What to ask every supplier
- What efficiency will the system achieve at our source and output temperatures, month by month?
- Which loads will it cover, and what stays on the boiler?
- How much thermal storage is in the design, and why?
- What refrigerant does it use, and what are the maintenance and leak-check obligations?
- Does the site need a supply upgrade, and who manages the DNO application?
- What performance guarantee and monitoring come with it?
We pass your enquiry to one installer that does industrial heat pump and heat recovery work. You won't be put on a ring-round list.
Sources checked 29 October 2026
- GOV.UK: Industrial Energy Transformation Fund (closed July 2025, no successor planned; updated 25 Jun 2026)
- GOV.UK: IETF Phase 3 Spring 2024 (closed to applications)
- Scottish Government: Scottish Industrial Energy Transformation Fund (all three calls closed)
- GOV.UK: Industrial Heat Recovery Support programme (closed July 2020)
- GOV.UK: Green Heat Network Fund, guidance on how to apply (Round 12 closed 25 Sep 2026)
- GHNF scheme overview, June 2026 (industrial waste heat supported; grant below 50% of costs; 2GWh minimum demand)
- GOV.UK: Heat Network Efficiency Scheme (Round 14 expected 30 Nov 2026; updated 12 Oct 2026)
- GOV.UK: British Industrial Competitiveness Scheme (up to £40/MWh off electricity costs from 2027)
- GOV.UK: BICS guidance for applicants (window closes 11:59pm 30 Nov 2026; GB only; 33MWh minimum)
- GOV.UK: Boiler Upgrade Scheme (homes and business buildings)
- Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026: extension to 2030
- Boiler Upgrade Scheme (England and Wales) Regulations 2022, reg. 9: capacity limits and the meaning of hot water (excludes process and pool heating)
- GOV.UK: Climate Change Levy rates
- HMRC Capital Allowances Manual CA22320: integral features (space or water heating systems) are special rate
- GOV.UK: full expensing and the 50% first-year allowance
- GOV.UK: Annual Investment Allowance (£1 million)
- Valuation for Rating (Plant and Machinery) (England) (Amendment) Regulations 2022 (SI 2022/405)
- Development Bank of Wales: Green Business Loan Scheme
- Business Energy Scotland: SME Loan
Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.