How the commercial solar calculator works
This free commercial solar calculator works out the system size your roof can take, its installed cost, your year-one saving and export income, payback, the 25-year gain and the solar PPA price that would beat buying. It needs only your postcode, roof, electricity use and working hours, and runs on published MCS, DESNZ, Ofgem and EU PVGIS figures.
The calculator follows the same steps an installer's first desk study does, using published figures instead of a sales pitch. Here is each step, and where it falls short.
1. Your sunlight. Your postcode puts you in one of the sunlight zones that MCS, the certification body for small-scale renewables, uses in its installation standard (MIS 3002 Issue 6.0). For each zone, MCS publishes how many kWh a year each kW of panels makes at every tilt and direction.
We read four cases: south and east-west, at 10° for flat and low-pitch roofs and at 30° for pitched roofs. Across the UK that runs from 609 kWh per kW (east-west at 30°, Shetland) to 1,121 kWh per kW (south at 30°, the Brighton zone covering Sussex and Kent). MCS has already multiplied these figures by 0.8, so we take nothing more off. They assume no shading.
2. How much fits on your roof. We keep panels 1 metre in from every edge, the margin England's permitted development rules require on a non-domestic roof. South-facing frames on a flat roof need gaps between rows so they don't shade each other: at a 10° tilt that leaves 61% of the space under panels. We then take off your allowance for rooflights, plant and walkways (10% unless you change it) and divide by 4.45 m² per kW, the footprint of a current 580 W commercial panel.
3. Your electricity price. If you give us your bill, we use your own unit rate. If not, we use the government's average price for a business your size, including the Climate Change Levy and excluding VAT.
4. How much you use yourself, hour by hour. Many calculators use a flat self-use percentage. We don't. We split the year's output into months, and each month into an average day of 24 hours, using the EU's PVGIS profiles for your zone.
Your demand goes on the same clock: the share you give for 7am to 7pm on working days is spread evenly across those hours, and the rest of your year's use is spread evenly across every other hour, including the whole of every closed day. In each hour the site uses whichever is smaller, what the panels make or what it needs, and exports the rest.
5. Money. Saving is the power you use yourself times your unit rate. Export income is what you export times the export rate. Running cost is £5.90 per kW a year. Payback is the installed cost divided by the year-one net saving. The 25-year gain adds up 25 years of savings and export, with output falling 0.4% a year, takes off running costs, and takes off the cost of the system. Those are plain cash totals unless you enter a discount rate, in which case each year is discounted and the result is a net present value.
6. Cost. We use the government's 2025/26 averages for your size band, as a range. If you are VAT-registered (the starting choice), the range runs from the non-domestic average with 20% taken off up to that average as published: about £973 to £1,167 per kW for 10-50 kW. The 20% deduction is our arithmetic, because DESNZ includes VAT "where applicable" and doesn't say every non-domestic job carried it. If you aren't VAT-registered, the range runs from the non-domestic average (£1,167) to the average for all installations (£1,267). The buy-outright totals, the size we pick and the PPA level price use the middle of the range; payback and the 25-year gain are shown across the whole range.
7. Size. Unless you choose one, we test every size your roof can take, in steps of half a kW up to 50 kW, 1 kW up to 500 kW and 5 kW above that, and pick the one with the biggest 25-year gain, worked at the middle of the cost range. In our worked examples with steady working-day use, the best size was the whole roof; with low use (the 60,000 kWh rerun) it wasn't.
Where the estimate is wrong. Every day in a month is treated as that month's average day, so we miss the difference between a bright day (more export) and a dull one. Demand inside the working day is flat, with no lunchtime dip or start-of-shift peak. Both mean real self-use will usually be a little lower than shown. We use first-year, unshaded output, and we hold prices flat unless you add a rise. An installer who models your half-hourly data and surveys the roof replaces every one of these shortcuts.
The assumptions behind every result
Every figure the calculator uses, where it comes from, and what kind of figure it is.
| Assumption | Value used | Source and date | Type |
|---|---|---|---|
| Yearly output per kW, by postcode zone, tilt and direction | 609 to 1,121 kWh per kW, first year, unshaded | MCS Irradiance Datasets (uploaded February 2025), with MIS 3002 Issue 6.0 (18 March 2026), Appendix B | Published figure |
| Postcode to sunlight zone | 21 zones (25 with east/west splits) | MIS 3002 Issue 6.0 Table 2; two misprinted rows read from SAP 10.2 Table U6 | Published figure |
| Spread of output across months and hours | Per-zone monthly output at your roof's own tilt; average hourly profile taken at a 10° tilt for all roof types | EU Joint Research Centre PVGIS 5.3 (PVGIS-SARAH3, 2005 to 2023), queried 20 November 2026 | Published figure |
| Your demand through the day | Your 7am-7pm working-day share spread evenly over those hours; the rest spread evenly over all other hours | Our method | Your own input, our arithmetic |
| Edge margin | 1 metre from every roof edge | GPDO 2015, Schedule 2, Part 14, Class J.1(c) (England) | Published figure |
| Row spacing, south-facing frames on a flat roof | 61% of space under panels | Our geometry: 10° tilt, rows clear of shade at a 15° sun | Our arithmetic |
| Roof lost to rooflights, plant and walkways | 10% | Starting figure for you to change | Your own input |
| Roof area per kW of panels | 4.45 m² | Datasheet of a current 580 W commercial panel (2,278 × 1,134 mm), see Sources | Our arithmetic from a published figure |
| Electricity unit price (if you don't enter yours) | 22.25p to 38.36p per kWh by business size; 28.59p for 20-499 MWh a year | DESNZ Quarterly Energy Prices, table 3.4.2, Q2 2026 provisional, published 29 September 2026 | Published figure |
| Export rate | 4.39p per kWh (0p in Northern Ireland) | Ofgem Smart Export Guarantee Annual Report, Year 5 (April 2024 to March 2025) | Published figure |
| Installed cost, 10-50 kW | Non-domestic mean £1,167; all-installations mean £1,267 per kW | DESNZ Solar PV cost data 2025/26 (TIC basis), published 28 May 2026 | Published figure |
| Installed cost, 4-10 kW | £1,320 and £1,622 per kW | Same | Published figure |
| Installed cost, up to 4 kW | £1,650 and £1,808 per kW | Same | Published figure |
| Installed cost, above 50 kW | 10-50 kW figures used as a reference | No official figure exists | Stand-in |
| VAT-registered cost range (the starting choice) | Non-domestic mean ÷ 1.2 up to the non-domestic mean (10-50 kW: about £973 to £1,167) | Standard VAT rate 20%; DESNZ figures include VAT "where applicable" and do not say every job carried it | Our arithmetic |
| Not VAT-registered cost range | Non-domestic mean up to all-installations mean | DESNZ, as above | Published figure |
| Running cost | £5.90 per kW a year | DESNZ Electricity generation costs 2025, Annex A (solar farm figure, 2024 prices) | Stand-in |
| Output loss per year | 0.4% | Panel manufacturer's warranty; range 0.29% to 0.45% given by industry respondents in an Arup report for DESNZ (July 2025) | Published figure |
| Analysis period | 25 years | Shorter than the 30-year panel warranty | Our choice |
| Electricity prices over time | Flat | Your own input if you want a rise | Your own input |
| Discount rate | 0% (plain cash totals) | Your cost of capital | Your own input |
| Your use, working-hours share and opening days | As entered | You | Your own input |
| Carbon avoided | 0.14395 kg CO2e per kWh used on site | DESNZ Greenhouse gas conversion factors 2026: generation 0.13096 + transmission and distribution 0.01299 | Our arithmetic from published figures |
| PPA price | None assumed | No published on-site PPA price | Your own input |
Commercial solar cost per kW in 2026
The government's own figure for a 10-50 kW non-domestic solar system in 2025/26 is £1,167 per kW, the average across 5,163 installations in DESNZ's solar cost data. That figure includes VAT where it applied, so for a VAT-registered business the real cost is likely to sit between about £973 per kW (the same average with 20% taken off) and £1,167. Across all 10-50 kW installations, homes included, the median was £1,204 per kW and the mean £1,267. Cost per kW rises steeply for small systems: non-domestic systems of 4-10 kW averaged £1,320 per kW, and up to 4 kW £1,650.
Which DESNZ table we use matters, because you will see other figures quoted. DESNZ publishes its 2025/26 cost data, released 28 May 2026, in two workbooks: a "TIC basis", where "Total Installed Capacity (TIC) refers to the total generation that an installation could generate at any one time", and a "DNC basis", where "Declared Net Capacity (DNC) measures the maximum amount of electricity that could be exported to the grid".
This calculator uses the TIC workbook's non-domestic mean (published as official statistics in development). A system's DNC is usually lower than its TIC, so DNC-basis costs come out higher per kW. DESNZ says TIC-based averages are "typically 6 - 12% lower" (£1,259 per kW for non-domestic 10-50 kW on DNC, across 4,368 installations, against £1,167 on TIC). The two files also sort some systems into different size bands, and a median or an all-installations figure differs again. None of them contradicts the others; they measure different things.
Where you are matters less than you might think. The 2025/26 regional averages for 10-50 kW (TIC basis) run from £1,162 per kW in the North East to £1,330 in the South East, with London at £1,214.
DESNZ's figures include "generation equipment, cost of installing and connecting to the electricity supply and VAT where applicable". They leave out batteries, extended warranties and "any other material or works carried out on the solar equipment". Roof repairs, structural work and any network reinforcement your operator asks for are not part of a standard installation, so budget for them separately.
So what does a 50 kW system cost? For a VAT-registered business, about £48,600 to £58,400 on these figures. Not VAT-registered, about £58,400 to £63,300. A 30 kW system comes out at about £29,200 to £35,000 for a VAT-registered business.
Why there is no official price for 100 kW, 250 kW or bigger
DESNZ's series stops at 50 kW because it is built from MCS-registered installations, and MCS's standard covers systems up to 50 kW. The government's other cost work covers solar farms over 5 MW and says plainly: "Small scale solar PV, including rooftop solar is not included." Nobody in government publishes a price for a 100 kW or 500 kW roof. Any website giving you a single £ per kW for a big commercial roof is quoting installer prices, not an official figure.
What the government's data does show, across its 0-50 kW bands, is that "the average cost per kW is lower for larger installations". So for anything over 50 kW, the calculator uses the 10-50 kW figures as an upper reference and flags it. To price your own system:
- Take £1,167 per kW (or about £973 before VAT) as a ceiling for a straightforward roof.
- Get a quote and divide the total by the system size in kW.
- Ask what the price includes: scaffolding or access, the G99 application, switchgear, any grid reinforcement, monitoring, and roof or structural work.
- Enter your quoted £ per kW in the calculator's advanced options to see the payback on your real price.
A quote well above those figures on a big, simple roof needs an explanation line by line. For a full breakdown by system size and what pushes a price up, see our guide to business solar panel costs.
Worked examples: 30 kW, 50 kW, 100 kW and 250 kW commercial solar
Four sites, run through the calculator exactly as shown. They are worked examples on stated assumptions, not typical results: your roof, your bill and your hours will give a different answer. Every input is listed so you can enter it and get the same figures. All four use the calculator's starting settings: VAT-registered (Yes), 4.39p export rate, £5.90 per kW running cost, 10% obstruction allowance, flat prices and no discount rate. The PPA level price and the "buying" totals in the PPA comparison use the middle of the cost range; payback and the 25-year gain are shown across the whole range.
| Office, Bristol | Workshop, Leeds | Warehouse, Birmingham | Factory, Glasgow | |
|---|---|---|---|---|
| Inputs | ||||
| Postcode | BS1 | LS10 | B11 | G52 |
| Roof | Pitched tiles, south | Low-pitch metal, east-west | Low-pitch metal, east-west | Flat, south-facing frames |
| Roof area | 300 m² | 400 m² | 800 m² | 3,000 m² |
| Yearly use | 60,000 kWh | 110,000 kWh | 220,000 kWh | 350,000 kWh |
| Used 7am-7pm on working days | 75% | 70% | 70% | 50% |
| Days open | 5 | 6 | 5 | 7 |
| VAT-registered | Yes | Yes | Yes | Yes |
| System size chosen | 30 kWp | 50 kWp | 100 kWp | 250 kWp |
| Outputs | ||||
| Sunlight zone (output per kW) | Bristol (964 kWh) | Sheffield (745 kWh) | Birmingham (785 kWh) | Glasgow (758 kWh) |
| Panels (580 W) | 52 | 87 | 173 | 432 |
| Unit rate used (DESNZ average) | 28.59p | 28.59p | 28.59p | 28.59p |
| Installed cost, before VAT | £29,200 to £35,000 | £48,600 to £58,400 | £97,300 to £116,700* | £243,200 to £291,800* |
| Year-one generation | 28,920 kWh | 37,250 kWh | 78,480 kWh | 189,480 kWh |
| Used on site | 23,570 kWh (81%) | 35,040 kWh (94%) | 67,730 kWh (86%) | 124,530 kWh (66%) |
| Exported | 5,360 kWh | 2,210 kWh | 10,760 kWh | 64,950 kWh |
| Bill saving, year one | £6,740 | £10,020 | £19,360 | £35,600 |
| Export income, year one | £240 | £100 | £470 | £2,850 |
| Running cost, year one | £180 | £300 | £590 | £1,480 |
| Payback | 4.3 to 5.2 years | 5.0 to 5.9 years | 5.1 to 6.1 years | 6.6 to 7.9 years |
| 25-year gain (cash, not discounted) | £126,800 to £132,600 | £175,400 to £185,100 | £341,300 to £360,800 | £587,900 to £636,500 |
| Carbon avoided, year one | 3.4 t CO2e | 5.0 t CO2e | 9.7 t CO2e | 17.9 t CO2e |
| PPA level price | 5.5p | 7.0p | 6.8p | 8.0p |
| Biggest system the roof takes | 47 kWp | 65.5 kWp | 139.5 kWp | 343.5 kWp |
*Above 50 kW: priced on the 10-50 kW government figures as a reference. Real prices for systems this size are likely to be lower per kW, if the DESNZ trend to 50 kW continues, so the payback shown is likely to be on the long side.
What the examples show:
- The workshop uses 94% of its solar on site. It runs six days a week, and a 50 kW system rarely outruns the demand of a 110,000 kWh site in its working hours. Only Sunday's output, and a little on the brightest summer middays, goes to the grid.
- The Glasgow factory runs seven days but exports a third. Half its use falls outside the working-day window, spread through the night, so on summer middays 250 kW of panels makes more than the site draws. That is what a big roof over a modest load looks like. It still pays back inside eight years.
- Scotland pays back. Put the Bristol office in Glasgow and its payback moves from 4.3-5.2 years to 5.0-6.0 years: lower sunlight costs under a year, not a decade. A business site in Scotland with steady daytime use is a sound solar site.
- Bigger roofs earn more in total but not faster in these figures, because the calculator holds the cost per kW flat above 50 kW. A real quote for 250 kW is likely to come in lower per kW, which would shorten the payback.
- Not VAT-registered? Run the Birmingham warehouse with VAT-registered set to No and the cost range becomes £116,700 to £126,700, with payback of 6.1 to 6.6 years and a level price of 7.8p.
For a deeper look at the 50 kW size that suits many SMEs, farms and schools, see our 50kW solar system cost and savings guide.
Commercial solar payback: what moves it
On these figures a business with steady working-day use and a sensible roof gets its money back in roughly four to eight years, and the panel we model carries a 30-year output warranty. Payback is the installed cost divided by the year's net saving, so anything that raises the saving or lowers the cost shortens it. In order of how much they move it:
1. How much you use yourself. Every kWh you use saves your full unit rate, about 28.59p for a business using 20-499 MWh a year. Every kWh you export earns the export rate, 4.39p on the average untied deal. A kWh used on site is worth more than six exported. Run the Birmingham warehouse again with the same 800 m² roof but only 60,000 kWh a year of use, a quarter of the original: the calculator shrinks the best-value system to 108 kWp, about 58% of the output is exported, and payback stretches to 8.9 to 10.7 years. A roof much bigger than the site's demand is the classic case for a smaller system or a battery.
2. When you use it. What you use in working hours soaks up solar; what you use at night doesn't. Opening days count too: a site shut at weekends exports most of what its panels make on Saturday and Sunday, unless something keeps running.
3. Your unit rate. The higher your rate, the faster solar pays. Smaller businesses pay more per kWh (38.36p for sites using under 20 MWh a year, on DESNZ's Q2 2026 average) and get faster paybacks on the share they use.
4. Price per kW. A good quote on a big roof is the cheapest way to shorten payback. See the method above.
5. Sunshine and direction. South-facing panels at 30° in Sussex and Kent make about 1,120 kWh per kW; east-west panels on a flat roof in Glasgow make about 700. It matters, but less than how you use the power.
6. Price rises. The calculator holds electricity prices flat. If you expect them to rise, add a yearly rise in the advanced options and the 25-year gain grows with it.
ROI in plain terms: the 25-year gain in the results is your return. For the Leeds workshop, a system costing about £48,600 before VAT returns about £185,100 more than it costs over 25 years in plain cash on these assumptions, before tax relief and before any price rises. Put a discount rate in and the figure becomes a net present value you can set against other investments.
Buy outright or a solar PPA: which pays more?
If your business can pay for the system or borrow cheaply, buying outright earned more in every one of our worked examples. If cash is better spent elsewhere, a funded PPA gets you cheaper power from day one with nothing upfront. The calculator tells you where the line falls for your site.
Buying outright. You pay the installed cost, own the system, keep every unit of saving and all the export income, and claim the capital allowances. Payback in the worked examples runs from about four to eight years, and the panels keep working long after.
A solar PPA. A funder pays for, fits and owns the panels on your roof. You buy the power they make at an agreed price per kWh for a fixed term, which you should compare with your grid rate. In the calculator, the funder keeps the export income and pays the running costs. Every contract differs, so check what yours says.
The level price is the number that matters. It is the break-even PPA rate: the flat price per kWh at which paying a funder for your solar power leaves you exactly as well off, over the term, as buying the system yourself. In the worked examples it sits between 5.5p and 8.0p per kWh. A PPA priced below that beats buying over 25 years. A PPA priced above it costs you more than buying, even though it still saves you money against the grid.
Take the Birmingham warehouse. Bought outright at the middle of its cost range, the 100 kWp system gains about £351,100 over 25 years in plain cash. A PPA at 70% of its 28.59p unit rate (20.01p) would save it about £5,810 in year one and £138,500 over 25 years, with nothing spent. Both are worth having. On cash totals, buying is worth more than twice as much.
Put your own discount rate in. The starting comparison adds up cash with no discount, which flatters whichever option pays out later. A finance director should enter the business's cost of capital. At 6%, for example, the warehouse's 25-year gain from buying becomes a net present value of about £130,100 against about £71,600 for the 70% PPA, and the level price rises from 6.8p to 13.0p per kWh. Buying still wins at that rate, but by less, and a PPA priced under 13.0p would now beat it. The higher your cost of capital, the better a PPA looks.
The level price also doesn't count the tax relief on buying, which makes buying better still.
Who should buy: profitable businesses with the cash or cheap finance, a long time left in the building and steady daytime use.
Who should take a PPA: businesses that want the saving without the capital spend, public bodies and charities with tight capital budgets, and sites where the funder's long-term contract fits the lease.
Who should not bother with either: sites that use most of their power at night, buildings you will leave within the payback period, and roofs that need replacing in the next few years.
No PPA price is built into the calculator because none is published. The government's own buying framework for (off-site) power purchase agreements says it "does not hold any live PPA pricing" and that pricing "will be bespoke". Get a real offer, enter it, and see it against the level price. Our commercial solar PPA guide covers the contract terms, the red flags and what funders look for in a roof.
Export and the Smart Export Guarantee
Anything you don't use goes to the grid, and the Smart Export Guarantee (SEG) is how you get paid for it in Great Britain. Ofgem's rules cover "anyone with an installation of one of the following technology types up to a capacity of 5MW", and "installations must be located in Great Britain". There is no SEG in Northern Ireland, so the calculator sets export income to zero there unless you enter a rate you have been offered.
There is no set SEG rate. Ofgem is clear: "SEG Licensees determine the rate, contract length and other terms", and "SEG tariff rates must always be above zero". In the latest year Ofgem has reported (April 2024 to March 2025), untied tariffs averaged 4.39p per kWh, from a low of 1p to a high of 12p. Tied tariffs, which need you to buy something else from the supplier, averaged 14.54p. The calculator uses 4.39p because it is the average of the tariffs offered without strings. If a supplier has offered you more, enter it.
Up to 50 kW, suppliers need an MCS certificate "or equivalent". Above 50 kW, Ofgem says suppliers "have discretion in how they satisfy themselves that the installation is suitably certified", so agree what proof your supplier wants before the system goes in.
The lesson for a business: export is a bonus, not the business case. Size the system to what you use in working hours, and treat export income as a top-up.
How much roof per kW, and how many panels?
A current 580 W commercial panel measures 2,278 × 1,134 mm, so each kW of panels takes about 4.45 m², or about 1.7 panels. That is panel area. The roof area you need is larger, because of the 1 metre edge margin, rooflights, plant, walkways and, on flat roofs, the gaps between rows.
How many kW a roof takes on the calculator's assumptions (10% obstruction allowance):
| Roof area | Pitched or low-pitch, or flat east-west | Flat, south-facing frames |
|---|---|---|
| 300 m² | about 47 kWp | about 29 kWp |
| 750 m² | about 130 kWp | about 79 kWp |
| 1,500 m² | about 272 kWp | about 166 kWp |
So a rough rule for a mid-size roof: about 6 m² of roof per kW on a pitched, metal or east-west flat roof, and about 9.5 m² per kW for south-facing frames on a flat roof. A 50 kW system needs a roof of roughly 300 to 500 m², and 100 kW roughly 600 to 950 m², depending on layout.
On a flat roof, east-west fits far more panels. South-facing frames make more per panel, but need wide gaps so one row doesn't shade the next. If you want the most kWh from a flat roof, east-west usually wins; if you want the best output per panel, south wins. The calculator lets you try both.
A structural survey decides what the roof can actually carry. Older metal roofs, fragile rooflights and asbestos cement sheets can rule out panels on part or all of a roof.
How much solar do I need for 30 kWh a day? A business using 30 kWh between 7am and 7pm on each working day needs a system whose daily output matches that in the months that matter. With a yearly output of about 785 kWh per kW in the Midlands, a kW of panels makes about 3.9 kWh on an average June day and well under 1 kWh in December. A system of roughly 8 to 10 kWp would cover 30 kWh on most summer days without much export. Put your own figures into the calculator for a site-specific answer.
Tax and business rates on commercial solar
Capital allowances. Solar panels are special-rate plant. GOV.UK lists solar panels in the special rate pool, which gets 6% a year writing down allowance. But the Annual Investment Allowance comes first, and "the AIA amount is £1 million". For most businesses that means the whole cost of a commercial roof system can be deducted from taxable profit in the year you buy it. Companies spending more than £1 million can claim a 50% first-year allowance on the excess: "If your claim is for special rate plant or machinery you can deduct half of the cost under the 50% first-year allowance". The remainder goes into the special rate pool.
Two allowances people get wrong:
- Full expensing (100% first-year relief with no cap) is for main rate plant only. Solar panels are special rate, so they get the 50% first-year allowance instead.
- The 40% first-year allowance from 1 January 2026 applies only to items that qualify for the main rate, so it does not apply to solar panels.
The calculator shows the amount you could deduct in year one, not the tax saved, because that depends on your tax rate. It is not in the payback, which makes the payback shown conservative for a profitable business. Our solar panels capital allowances guide explains the claim in detail. Not tax advice: check with your accountant.
VAT. Business premises pay the standard 20% VAT on solar. The 0% rate on energy-saving materials covers homes and, from 1 February 2024, buildings used solely for a relevant charitable purpose, and runs to 31 March 2027. A VAT-registered business normally reclaims the VAT, and the calculator starts with "VAT-registered?" set to Yes, so its costs are before VAT. Switch it to No if you can't reclaim VAT.
Business rates in England. On-site solar does not raise your rateable value in England. The rating regulations exclude "excepted renewables plant and machinery", which covers plant where the energy source is "mainly or exclusively… photovoltaics", for "any day before 1st April 2035". Wales, Scotland and Northern Ireland set their own rating rules, so check with your local rating authority or assessor there.
Grid connection and planning permission for commercial solar
Grid connection. Every business system has to go through your network operator's connection process. The operator's procedure (we quote National Grid Electricity Distribution's) splits it in two. G98 covers small, fully type-tested systems up to 16A per phase, which you register within 28 days of switching on. That is 3.68 kW per phase, or about 11 kW on a three-phase supply. Anything bigger needs a G99 application, with a simplified route for systems up to 50 kW on three-phase. Above 50 kW the application is fuller; on a weak local network it can bring an export limit or a reinforcement charge. Your installer handles the application; ask early what your site's connection will allow.
Planning in England. Most business roof solar is permitted development under Class J of the General Permitted Development Order, so it doesn't need a full planning application. The rules that matter:
- Panels must stay at least 1 metre from the roof's edges.
- On a flat roof, they can't stand more than 1 metre above the highest part of the roof.
- On a pitched roof, they can't stick out more than 0.2 metres from the slope.
- Listed buildings, their grounds and scheduled monuments are excluded.
The old 1 MW limit on non-domestic roofs was removed on 21 December 2023, so big warehouse and factory roofs no longer need full planning permission on size alone.
Above 50 kW (anything bigger than "microgeneration") you must first apply to the council for a decision on whether its prior approval is needed "as to the design or external appearance of the development, in particular the impact of glare on occupiers of neighbouring land". If the council hasn't replied within 56 days, you can go ahead. It's a lighter process than a planning application, but it isn't optional. Systems of 50 kW or less don't need this step. Wales, Scotland and Northern Ireland have their own permitted development rules: ask your council's planning team before you commit.
Solar on a leased building
You can put solar on a building you rent, but you need the landlord's written consent, and the lease has to run long enough for the system to pay off. If payback is seven years and your lease ends in four, buying outright is a gift to your landlord unless you agree terms.
Questions to settle with the landlord before you get a quote:
- Who owns the panels, and what happens to them when the lease ends: removal, transfer or sale to the landlord?
- Who pays if the roof needs repairs under the panels?
- Does the roof's insurance and the building's fire strategy allow them?
- Will the landlord extend the lease, or take on the system and its savings in a new one?
A PPA on a leased building needs the landlord to agree to the funder's equipment staying on the roof for the full term. Expect a funder to ask for that before it makes an offer.
When commercial solar isn't worth it, or this estimate will be wrong
Solar is not right for every business, and we would rather you knew now.
Don't bother if:
- You use most of your power at night or at weekends and are shut on sunny days.
- You expect to leave the building before payback.
- The roof needs replacing within the next few years. Fit solar after the new roof, not before.
- The roof is heavily shaded by taller buildings or trees.
The estimate will be wrong if:
- Your roof is shaded. The figures assume none.
- Your use is very peaky, with big loads early morning or evening and little at midday. Real self-use will be lower than shown.
- Your quote above 50 kW is much cheaper per kW than the government's 10-50 kW figure. The payback here will be too long; enter the real price.
- Your roof can't carry the weight or needs strengthening. The cost shown excludes structural work.
- Your network operator limits export or asks for reinforcement.
- You're in Northern Ireland: the cost figures come from Great Britain.
A battery can lift self-use on sites that are shut at weekends or peak in the evening. The calculator doesn't model one. Our commercial battery storage guide covers when one pays.
How to get a full commercial solar quote
The calculator is built to give you a first number in about a minute. A quote you can sign takes a site visit. Here is what a proper quote should be built on:
- Half-hourly data. Ask your supplier for 12 months of half-hourly readings, or at least 12 monthly bills. The installer models your real load against the solar output hour by hour.
- A roof survey. Structure, condition, fragile rooflights, access and fire walkways.
- A grid check. What your connection allows and whether G99 or reinforcement is needed.
- A design and yield figure. Output per year, with shading assessed, from a named method.
- A priced breakdown. Panels, inverters, mounting, scaffolding or access, electrical work, the grid application, monitoring and warranties.
- Buy and PPA side by side, if your site suits a funder, so you can compare the offer against the level price.
Use the button under your estimate and we will pass your answers to one vetted installer for your area, so you don't have to type them twice. See how we choose them on our commercial solar installers page.
Solar for your kind of business
The calculator works for any roof, but each type of building has its own quirks:
- Warehouse solar panels: big roofs, often more roof than demand.
- Factory solar panels: high daytime load, the strongest case for buying.
- Farm solar panels: barns, dairies and ground-mount options.
- School solar panels: term-time and holiday demand, and public funding routes.
- Solar panels for small businesses: shops, offices and units under 50 kW.
- Commercial solar panels: the full guide for UK businesses.
- Commercial solar panel grants: what funding exists for business solar, and what doesn't.
- Business energy grants: every grant, allowance and scheme for business energy in one place.
Sources checked 20 November 2026
- MCS. Irradiance Datasets (workbook, uploaded February 2025). mcscertified.com/?standard=irradiance-datasets
- MCS. MIS 3002: The Solar PV Standard (Installation), Issue 6.0, 18 March 2026, Appendix B and Table 2. mcscertified.com/wp-content/uploads/2026/03/MIS-3002_Solar-PV-Systems-V6.0-Final.pdf
- BRE. SAP 10.2, Version 10.2 (11-04-2023), Table U6 (postcode regions), used for two rows misprinted in MIS 3002. bregroup.com/sap/sap10
- European Commission Joint Research Centre. PVGIS 5.3 (PVGIS-SARAH3, 2005 to 2023), monthly energy output and average daily irradiance profile, queried 20 November 2026. re.jrc.ec.europa.eu/pvg_tools/en/
- Department for Energy Security and Net Zero. Solar photovoltaic (PV) cost data, 2025/26, updated 28 May 2026 (TIC basis workbook used; DNC basis workbook cited for comparison). www.gov.uk/government/statistics/solar-pv-cost-data
- Department for Energy Security and Net Zero. Gas and electricity prices in the non-domestic sector (Quarterly Energy Prices tables 3.4.1 and 3.4.2), Q2 2026 provisional, published 29 September 2026. www.gov.uk/government/statistical-data-sets/gas-and-electricity-prices-in-the-non-domestic-sector
- Ofgem. Smart Export Guarantee (SEG). www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg
- Ofgem. Smart Export Guarantee Annual Report, SEG Year 5 (1 April 2024 to 31 March 2025), December 2025. www.ofgem.gov.uk/transparency-document/smart-export-guarantee-annual-report-april-2024-march-2025
- Department for Energy Security and Net Zero. Electricity generation costs 2025, published 14 January 2026, updated 18 March 2026, report and Annex A (fixed O&M for 2030 projects, 2024 prices). www.gov.uk/government/publications/electricity-generation-costs-2025
- Arup for DESNZ. Renewable Energy Generation Cost and Technical Assumptions – Onshore Wind and Solar PV: Cost of Electricity Report Update 2024, Final Version, 14 July 2025. assets.publishing.service.gov.uk/media/68ba91f411b4ded2da19fe92/onshore-wind-and-solar-pv-cost-electricity-report-update-2024.pdf
- JinkoSolar. Tiger Neo N-type 72HL4-BDV 560-580 W datasheet (JKM560-580N-72HL4-BDV-F6-EN). jinkosolar.com/uploads/JKM560-580N-72HL4-BDV-F6-EN.pdf
- Department for Energy Security and Net Zero. Greenhouse gas reporting: conversion factors 2026, full set, published 11 June 2026. www.gov.uk/government/publications/greenhouse-gas-reporting-conversion-factors-2026
- Government Commercial Agency. RM6289 Provision of Power Purchase Agreement. www.gca.gov.uk/agreements/RM6289
- GOV.UK. Work out your writing down allowances: rates and pools. www.gov.uk/work-out-capital-allowances/rates-and-pools
- GOV.UK. Capital allowances: Annual Investment Allowance. www.gov.uk/capital-allowances/annual-investment-allowance
- HM Revenue & Customs. Check if you can claim full expensing or 50% first year allowances, updated 20 March 2024. www.gov.uk/guidance/check-if-you-can-claim-full-expensing-or-50-first-year-allowances
- HM Revenue & Customs. VAT on energy-saving materials and heating equipment (VAT Notice 708/6), updated 31 January 2024. www.gov.uk/guidance/vat-on-energy-saving-materials-and-heating-equipment-notice-7086
- legislation.gov.uk. The Valuation for Rating (Plant and Machinery) (England) (Amendment) Regulations 2022 (SI 2022/405). www.legislation.gov.uk/uksi/2022/405/made
- legislation.gov.uk. The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 14, Class J (current text). www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14
- National Grid Electricity Distribution. G98 connection procedures and G99 connection procedures. connections.nationalgrid.co.uk/g98-connection-procedures/ · connections.nationalgrid.co.uk/g99-connection-procedures/
- EC&M. Solar Photovoltaic Systems, Part 2 (on National Electrical Code section 705.12, US). www.ecmweb.com/code-basics/solar-photovoltaic-systems-part-2-0