Commercial Solar Calculator: Your Free Cost, Payback and PPA Estimate in 60 Seconds

A 10-50 kW business solar system costs about £973 to £1,167 per kW before VAT, worked from the government's own 2025/26 figures, and every unit you use on site saves what you would have paid your supplier. Put in your postcode, roof and electricity bill and this calculator works out the system size your roof can take, the installed cost range, the year-one saving and export income, the payback in years and the 25-year gain. It also shows what a solar PPA would have to cost to beat buying, so you know where you stand before any installer calls.

Updated 20 November 2026 · Independent guide, not the government's Great British Energy (gbe.gov.uk) · Worked from DESNZ, MCS and Ofgem figures

Work out your commercial solar cost, saving and payback

Eight questions. Nothing is sent anywhere until you ask for a full quote.

The first part is enough, like M17 or CF10. We use it to find the sunlight figures for your area. Letters alone (like CH) work, but some areas are split, so add the number if you can.

Measure only the roof faces that would take panels. On a pitched roof that is usually the south face, or both faces if the roof runs east-west. Measure along the slope, not the floor plan: for a roof at about 30°, the slope is about 1.15 times the floor area beneath it. Not sure? Pick a size band and change the figure later.

These are starting points, not measurements. Satellite map tools or your building plans will give you a better figure.

Roof type

This sets the panel tilt we assume: 10° for flat and low-pitch roofs, 30° for pitched roofs.

Which way would the panels face?

South gives more output per panel. East-west fits more panels on a flat or low-pitch roof and spreads output across the day. "Not sure" uses east-west, the lower figure.

Office, warehouse, factory, farm, school, retail and so on. It helps the installer; it does not change the maths.

Add up the kWh on your last 12 monthly bills, or look for "annual consumption" on a recent bill or your supply contract.

Enter either. If you enter both, we work out your unit rate from them.

How much of your electricity is used between 7am and 7pm on working days?

This is your judgement, and it moves the result more than anything else. An office or workshop that opens weekdays and shuts by early evening uses most of its power in that window: 70% to 80%. A site that runs night shifts, or keeps big loads such as refrigeration running round the clock, uses less of it: 40% to 60%. Sites busiest early morning, late evening or overnight: 10% to 30%. Only a site that uses almost nothing outside its working hours should pick 90% or 100%. We spread the rest of your use evenly over nights and closed days. If you have half-hourly meter data, add up the readings from 7am to 7pm on working days and divide by the year's total.

Days a week the site runs

On days the site is shut, we assume everything the panels make is exported.

Do you own or lease the building?

Leaseholders can still go solar, but you will need the landlord's consent and a lease long enough to see the payback.

VAT-registered? (starts at Yes)

Yes if your business reclaims VAT. The cost range then runs from the government's non-domestic average with 20% taken off, up to that average as published. The 20% deduction is our arithmetic: DESNZ includes VAT "where applicable" and does not say every job carried it. Choose No and the range runs from the non-domestic average to the average for all installations.

Fine-tune the figures (optional)

From your bill or contract. Leave blank to use the DESNZ average for a business your size.

Leave blank to use 4.39p, the Ofgem average untied rate. Untied rates ran from 1p to 12p.

Have a quote already? Enter its price per kW and the payback is worked from it.

Starts at £5.90, a government figure for solar farms. No rooftop figure is published, so change it if you have a maintenance quote.

Starts at 10%. Raise it for a cluttered roof or lots of rooflights.

Starts at 0%, so prices stay flat. Add your own view if you want one.

Only if you have an offer. We assume no PPA price, because none is published.

The length of the offer. Starts at 25.

Most offers state how the price rises each year. Enter it here.

Starts at 0%, so the 25-year figures are plain cash totals. Put in your borrowing rate or the return you expect elsewhere, and the 25-year gain becomes a net present value, with the PPA comparison and level price discounted the same way.

Indicative estimate

Your results appear here

Fill in your site and press Show my estimate. The sums run in your browser.

£1,167/kWAverage installed cost of a 10-50 kW non-domestic solar system, 2025/26DESNZ Solar PV cost data, May 2026
28.59pAverage business electricity price per kWh for sites using 20-499 MWh a year, Q2 2026DESNZ Quarterly Energy Prices, table 3.4.2
4.39pAverage untied Smart Export Guarantee rate per kWh exportedOfgem SEG Annual Report, Year 5
£1mAnnual Investment Allowance that can cover the whole cost in year oneGOV.UK capital allowances

Business, farm, school or charity? You're in the right place. Pricing solar for your home? Home solar savings calculator →

How the commercial solar calculator works

This free commercial solar calculator works out the system size your roof can take, its installed cost, your year-one saving and export income, payback, the 25-year gain and the solar PPA price that would beat buying. It needs only your postcode, roof, electricity use and working hours, and runs on published MCS, DESNZ, Ofgem and EU PVGIS figures.

The calculator follows the same steps an installer's first desk study does, using published figures instead of a sales pitch. Here is each step, and where it falls short.

1. Your sunlight. Your postcode puts you in one of the sunlight zones that MCS, the certification body for small-scale renewables, uses in its installation standard (MIS 3002 Issue 6.0). For each zone, MCS publishes how many kWh a year each kW of panels makes at every tilt and direction.

We read four cases: south and east-west, at 10° for flat and low-pitch roofs and at 30° for pitched roofs. Across the UK that runs from 609 kWh per kW (east-west at 30°, Shetland) to 1,121 kWh per kW (south at 30°, the Brighton zone covering Sussex and Kent). MCS has already multiplied these figures by 0.8, so we take nothing more off. They assume no shading.

2. How much fits on your roof. We keep panels 1 metre in from every edge, the margin England's permitted development rules require on a non-domestic roof. South-facing frames on a flat roof need gaps between rows so they don't shade each other: at a 10° tilt that leaves 61% of the space under panels. We then take off your allowance for rooflights, plant and walkways (10% unless you change it) and divide by 4.45 m² per kW, the footprint of a current 580 W commercial panel.

3. Your electricity price. If you give us your bill, we use your own unit rate. If not, we use the government's average price for a business your size, including the Climate Change Levy and excluding VAT.

4. How much you use yourself, hour by hour. Many calculators use a flat self-use percentage. We don't. We split the year's output into months, and each month into an average day of 24 hours, using the EU's PVGIS profiles for your zone.

Your demand goes on the same clock: the share you give for 7am to 7pm on working days is spread evenly across those hours, and the rest of your year's use is spread evenly across every other hour, including the whole of every closed day. In each hour the site uses whichever is smaller, what the panels make or what it needs, and exports the rest.

5. Money. Saving is the power you use yourself times your unit rate. Export income is what you export times the export rate. Running cost is £5.90 per kW a year. Payback is the installed cost divided by the year-one net saving. The 25-year gain adds up 25 years of savings and export, with output falling 0.4% a year, takes off running costs, and takes off the cost of the system. Those are plain cash totals unless you enter a discount rate, in which case each year is discounted and the result is a net present value.

6. Cost. We use the government's 2025/26 averages for your size band, as a range. If you are VAT-registered (the starting choice), the range runs from the non-domestic average with 20% taken off up to that average as published: about £973 to £1,167 per kW for 10-50 kW. The 20% deduction is our arithmetic, because DESNZ includes VAT "where applicable" and doesn't say every non-domestic job carried it. If you aren't VAT-registered, the range runs from the non-domestic average (£1,167) to the average for all installations (£1,267). The buy-outright totals, the size we pick and the PPA level price use the middle of the range; payback and the 25-year gain are shown across the whole range.

7. Size. Unless you choose one, we test every size your roof can take, in steps of half a kW up to 50 kW, 1 kW up to 500 kW and 5 kW above that, and pick the one with the biggest 25-year gain, worked at the middle of the cost range. In our worked examples with steady working-day use, the best size was the whole roof; with low use (the 60,000 kWh rerun) it wasn't.

Where the estimate is wrong. Every day in a month is treated as that month's average day, so we miss the difference between a bright day (more export) and a dull one. Demand inside the working day is flat, with no lunchtime dip or start-of-shift peak. Both mean real self-use will usually be a little lower than shown. We use first-year, unshaded output, and we hold prices flat unless you add a rise. An installer who models your half-hourly data and surveys the roof replaces every one of these shortcuts.

The assumptions behind every result

Every figure the calculator uses, where it comes from, and what kind of figure it is.

AssumptionValue usedSource and dateType
Yearly output per kW, by postcode zone, tilt and direction609 to 1,121 kWh per kW, first year, unshadedMCS Irradiance Datasets (uploaded February 2025), with MIS 3002 Issue 6.0 (18 March 2026), Appendix BPublished figure
Postcode to sunlight zone21 zones (25 with east/west splits)MIS 3002 Issue 6.0 Table 2; two misprinted rows read from SAP 10.2 Table U6Published figure
Spread of output across months and hoursPer-zone monthly output at your roof's own tilt; average hourly profile taken at a 10° tilt for all roof typesEU Joint Research Centre PVGIS 5.3 (PVGIS-SARAH3, 2005 to 2023), queried 20 November 2026Published figure
Your demand through the dayYour 7am-7pm working-day share spread evenly over those hours; the rest spread evenly over all other hoursOur methodYour own input, our arithmetic
Edge margin1 metre from every roof edgeGPDO 2015, Schedule 2, Part 14, Class J.1(c) (England)Published figure
Row spacing, south-facing frames on a flat roof61% of space under panelsOur geometry: 10° tilt, rows clear of shade at a 15° sunOur arithmetic
Roof lost to rooflights, plant and walkways10%Starting figure for you to changeYour own input
Roof area per kW of panels4.45 m²Datasheet of a current 580 W commercial panel (2,278 × 1,134 mm), see SourcesOur arithmetic from a published figure
Electricity unit price (if you don't enter yours)22.25p to 38.36p per kWh by business size; 28.59p for 20-499 MWh a yearDESNZ Quarterly Energy Prices, table 3.4.2, Q2 2026 provisional, published 29 September 2026Published figure
Export rate4.39p per kWh (0p in Northern Ireland)Ofgem Smart Export Guarantee Annual Report, Year 5 (April 2024 to March 2025)Published figure
Installed cost, 10-50 kWNon-domestic mean £1,167; all-installations mean £1,267 per kWDESNZ Solar PV cost data 2025/26 (TIC basis), published 28 May 2026Published figure
Installed cost, 4-10 kW£1,320 and £1,622 per kWSamePublished figure
Installed cost, up to 4 kW£1,650 and £1,808 per kWSamePublished figure
Installed cost, above 50 kW10-50 kW figures used as a referenceNo official figure existsStand-in
VAT-registered cost range (the starting choice)Non-domestic mean ÷ 1.2 up to the non-domestic mean (10-50 kW: about £973 to £1,167)Standard VAT rate 20%; DESNZ figures include VAT "where applicable" and do not say every job carried itOur arithmetic
Not VAT-registered cost rangeNon-domestic mean up to all-installations meanDESNZ, as abovePublished figure
Running cost£5.90 per kW a yearDESNZ Electricity generation costs 2025, Annex A (solar farm figure, 2024 prices)Stand-in
Output loss per year0.4%Panel manufacturer's warranty; range 0.29% to 0.45% given by industry respondents in an Arup report for DESNZ (July 2025)Published figure
Analysis period25 yearsShorter than the 30-year panel warrantyOur choice
Electricity prices over timeFlatYour own input if you want a riseYour own input
Discount rate0% (plain cash totals)Your cost of capitalYour own input
Your use, working-hours share and opening daysAs enteredYouYour own input
Carbon avoided0.14395 kg CO2e per kWh used on siteDESNZ Greenhouse gas conversion factors 2026: generation 0.13096 + transmission and distribution 0.01299Our arithmetic from published figures
PPA priceNone assumedNo published on-site PPA priceYour own input

Commercial solar cost per kW in 2026

The government's own figure for a 10-50 kW non-domestic solar system in 2025/26 is £1,167 per kW, the average across 5,163 installations in DESNZ's solar cost data. That figure includes VAT where it applied, so for a VAT-registered business the real cost is likely to sit between about £973 per kW (the same average with 20% taken off) and £1,167. Across all 10-50 kW installations, homes included, the median was £1,204 per kW and the mean £1,267. Cost per kW rises steeply for small systems: non-domestic systems of 4-10 kW averaged £1,320 per kW, and up to 4 kW £1,650.

Which DESNZ table we use matters, because you will see other figures quoted. DESNZ publishes its 2025/26 cost data, released 28 May 2026, in two workbooks: a "TIC basis", where "Total Installed Capacity (TIC) refers to the total generation that an installation could generate at any one time", and a "DNC basis", where "Declared Net Capacity (DNC) measures the maximum amount of electricity that could be exported to the grid".

This calculator uses the TIC workbook's non-domestic mean (published as official statistics in development). A system's DNC is usually lower than its TIC, so DNC-basis costs come out higher per kW. DESNZ says TIC-based averages are "typically 6 - 12% lower" (£1,259 per kW for non-domestic 10-50 kW on DNC, across 4,368 installations, against £1,167 on TIC). The two files also sort some systems into different size bands, and a median or an all-installations figure differs again. None of them contradicts the others; they measure different things.

Where you are matters less than you might think. The 2025/26 regional averages for 10-50 kW (TIC basis) run from £1,162 per kW in the North East to £1,330 in the South East, with London at £1,214.

DESNZ's figures include "generation equipment, cost of installing and connecting to the electricity supply and VAT where applicable". They leave out batteries, extended warranties and "any other material or works carried out on the solar equipment". Roof repairs, structural work and any network reinforcement your operator asks for are not part of a standard installation, so budget for them separately.

So what does a 50 kW system cost? For a VAT-registered business, about £48,600 to £58,400 on these figures. Not VAT-registered, about £58,400 to £63,300. A 30 kW system comes out at about £29,200 to £35,000 for a VAT-registered business.

Why there is no official price for 100 kW, 250 kW or bigger

DESNZ's series stops at 50 kW because it is built from MCS-registered installations, and MCS's standard covers systems up to 50 kW. The government's other cost work covers solar farms over 5 MW and says plainly: "Small scale solar PV, including rooftop solar is not included." Nobody in government publishes a price for a 100 kW or 500 kW roof. Any website giving you a single £ per kW for a big commercial roof is quoting installer prices, not an official figure.

What the government's data does show, across its 0-50 kW bands, is that "the average cost per kW is lower for larger installations". So for anything over 50 kW, the calculator uses the 10-50 kW figures as an upper reference and flags it. To price your own system:

  1. Take £1,167 per kW (or about £973 before VAT) as a ceiling for a straightforward roof.
  2. Get a quote and divide the total by the system size in kW.
  3. Ask what the price includes: scaffolding or access, the G99 application, switchgear, any grid reinforcement, monitoring, and roof or structural work.
  4. Enter your quoted £ per kW in the calculator's advanced options to see the payback on your real price.

A quote well above those figures on a big, simple roof needs an explanation line by line. For a full breakdown by system size and what pushes a price up, see our guide to business solar panel costs.

Worked examples: 30 kW, 50 kW, 100 kW and 250 kW commercial solar

Four sites, run through the calculator exactly as shown. They are worked examples on stated assumptions, not typical results: your roof, your bill and your hours will give a different answer. Every input is listed so you can enter it and get the same figures. All four use the calculator's starting settings: VAT-registered (Yes), 4.39p export rate, £5.90 per kW running cost, 10% obstruction allowance, flat prices and no discount rate. The PPA level price and the "buying" totals in the PPA comparison use the middle of the cost range; payback and the 25-year gain are shown across the whole range.

Office, BristolWorkshop, LeedsWarehouse, BirminghamFactory, Glasgow
Inputs
PostcodeBS1LS10B11G52
RoofPitched tiles, southLow-pitch metal, east-westLow-pitch metal, east-westFlat, south-facing frames
Roof area300 m²400 m²800 m²3,000 m²
Yearly use60,000 kWh110,000 kWh220,000 kWh350,000 kWh
Used 7am-7pm on working days75%70%70%50%
Days open5657
VAT-registeredYesYesYesYes
System size chosen30 kWp50 kWp100 kWp250 kWp
Outputs
Sunlight zone (output per kW)Bristol (964 kWh)Sheffield (745 kWh)Birmingham (785 kWh)Glasgow (758 kWh)
Panels (580 W)5287173432
Unit rate used (DESNZ average)28.59p28.59p28.59p28.59p
Installed cost, before VAT£29,200 to £35,000£48,600 to £58,400£97,300 to £116,700*£243,200 to £291,800*
Year-one generation28,920 kWh37,250 kWh78,480 kWh189,480 kWh
Used on site23,570 kWh (81%)35,040 kWh (94%)67,730 kWh (86%)124,530 kWh (66%)
Exported5,360 kWh2,210 kWh10,760 kWh64,950 kWh
Bill saving, year one£6,740£10,020£19,360£35,600
Export income, year one£240£100£470£2,850
Running cost, year one£180£300£590£1,480
Payback4.3 to 5.2 years5.0 to 5.9 years5.1 to 6.1 years6.6 to 7.9 years
25-year gain (cash, not discounted)£126,800 to £132,600£175,400 to £185,100£341,300 to £360,800£587,900 to £636,500
Carbon avoided, year one3.4 t CO2e5.0 t CO2e9.7 t CO2e17.9 t CO2e
PPA level price5.5p7.0p6.8p8.0p
Biggest system the roof takes47 kWp65.5 kWp139.5 kWp343.5 kWp

*Above 50 kW: priced on the 10-50 kW government figures as a reference. Real prices for systems this size are likely to be lower per kW, if the DESNZ trend to 50 kW continues, so the payback shown is likely to be on the long side.

What the examples show:

  • The workshop uses 94% of its solar on site. It runs six days a week, and a 50 kW system rarely outruns the demand of a 110,000 kWh site in its working hours. Only Sunday's output, and a little on the brightest summer middays, goes to the grid.
  • The Glasgow factory runs seven days but exports a third. Half its use falls outside the working-day window, spread through the night, so on summer middays 250 kW of panels makes more than the site draws. That is what a big roof over a modest load looks like. It still pays back inside eight years.
  • Scotland pays back. Put the Bristol office in Glasgow and its payback moves from 4.3-5.2 years to 5.0-6.0 years: lower sunlight costs under a year, not a decade. A business site in Scotland with steady daytime use is a sound solar site.
  • Bigger roofs earn more in total but not faster in these figures, because the calculator holds the cost per kW flat above 50 kW. A real quote for 250 kW is likely to come in lower per kW, which would shorten the payback.
  • Not VAT-registered? Run the Birmingham warehouse with VAT-registered set to No and the cost range becomes £116,700 to £126,700, with payback of 6.1 to 6.6 years and a level price of 7.8p.

For a deeper look at the 50 kW size that suits many SMEs, farms and schools, see our 50kW solar system cost and savings guide.

Commercial solar payback: what moves it

On these figures a business with steady working-day use and a sensible roof gets its money back in roughly four to eight years, and the panel we model carries a 30-year output warranty. Payback is the installed cost divided by the year's net saving, so anything that raises the saving or lowers the cost shortens it. In order of how much they move it:

1. How much you use yourself. Every kWh you use saves your full unit rate, about 28.59p for a business using 20-499 MWh a year. Every kWh you export earns the export rate, 4.39p on the average untied deal. A kWh used on site is worth more than six exported. Run the Birmingham warehouse again with the same 800 m² roof but only 60,000 kWh a year of use, a quarter of the original: the calculator shrinks the best-value system to 108 kWp, about 58% of the output is exported, and payback stretches to 8.9 to 10.7 years. A roof much bigger than the site's demand is the classic case for a smaller system or a battery.

2. When you use it. What you use in working hours soaks up solar; what you use at night doesn't. Opening days count too: a site shut at weekends exports most of what its panels make on Saturday and Sunday, unless something keeps running.

3. Your unit rate. The higher your rate, the faster solar pays. Smaller businesses pay more per kWh (38.36p for sites using under 20 MWh a year, on DESNZ's Q2 2026 average) and get faster paybacks on the share they use.

4. Price per kW. A good quote on a big roof is the cheapest way to shorten payback. See the method above.

5. Sunshine and direction. South-facing panels at 30° in Sussex and Kent make about 1,120 kWh per kW; east-west panels on a flat roof in Glasgow make about 700. It matters, but less than how you use the power.

6. Price rises. The calculator holds electricity prices flat. If you expect them to rise, add a yearly rise in the advanced options and the 25-year gain grows with it.

ROI in plain terms: the 25-year gain in the results is your return. For the Leeds workshop, a system costing about £48,600 before VAT returns about £185,100 more than it costs over 25 years in plain cash on these assumptions, before tax relief and before any price rises. Put a discount rate in and the figure becomes a net present value you can set against other investments.

Buy outright or a solar PPA: which pays more?

If your business can pay for the system or borrow cheaply, buying outright earned more in every one of our worked examples. If cash is better spent elsewhere, a funded PPA gets you cheaper power from day one with nothing upfront. The calculator tells you where the line falls for your site.

Buying outright. You pay the installed cost, own the system, keep every unit of saving and all the export income, and claim the capital allowances. Payback in the worked examples runs from about four to eight years, and the panels keep working long after.

A solar PPA. A funder pays for, fits and owns the panels on your roof. You buy the power they make at an agreed price per kWh for a fixed term, which you should compare with your grid rate. In the calculator, the funder keeps the export income and pays the running costs. Every contract differs, so check what yours says.

The level price is the number that matters. It is the break-even PPA rate: the flat price per kWh at which paying a funder for your solar power leaves you exactly as well off, over the term, as buying the system yourself. In the worked examples it sits between 5.5p and 8.0p per kWh. A PPA priced below that beats buying over 25 years. A PPA priced above it costs you more than buying, even though it still saves you money against the grid.

Take the Birmingham warehouse. Bought outright at the middle of its cost range, the 100 kWp system gains about £351,100 over 25 years in plain cash. A PPA at 70% of its 28.59p unit rate (20.01p) would save it about £5,810 in year one and £138,500 over 25 years, with nothing spent. Both are worth having. On cash totals, buying is worth more than twice as much.

Put your own discount rate in. The starting comparison adds up cash with no discount, which flatters whichever option pays out later. A finance director should enter the business's cost of capital. At 6%, for example, the warehouse's 25-year gain from buying becomes a net present value of about £130,100 against about £71,600 for the 70% PPA, and the level price rises from 6.8p to 13.0p per kWh. Buying still wins at that rate, but by less, and a PPA priced under 13.0p would now beat it. The higher your cost of capital, the better a PPA looks.

The level price also doesn't count the tax relief on buying, which makes buying better still.

Who should buy: profitable businesses with the cash or cheap finance, a long time left in the building and steady daytime use.

Who should take a PPA: businesses that want the saving without the capital spend, public bodies and charities with tight capital budgets, and sites where the funder's long-term contract fits the lease.

Who should not bother with either: sites that use most of their power at night, buildings you will leave within the payback period, and roofs that need replacing in the next few years.

No PPA price is built into the calculator because none is published. The government's own buying framework for (off-site) power purchase agreements says it "does not hold any live PPA pricing" and that pricing "will be bespoke". Get a real offer, enter it, and see it against the level price. Our commercial solar PPA guide covers the contract terms, the red flags and what funders look for in a roof.

Export and the Smart Export Guarantee

Anything you don't use goes to the grid, and the Smart Export Guarantee (SEG) is how you get paid for it in Great Britain. Ofgem's rules cover "anyone with an installation of one of the following technology types up to a capacity of 5MW", and "installations must be located in Great Britain". There is no SEG in Northern Ireland, so the calculator sets export income to zero there unless you enter a rate you have been offered.

There is no set SEG rate. Ofgem is clear: "SEG Licensees determine the rate, contract length and other terms", and "SEG tariff rates must always be above zero". In the latest year Ofgem has reported (April 2024 to March 2025), untied tariffs averaged 4.39p per kWh, from a low of 1p to a high of 12p. Tied tariffs, which need you to buy something else from the supplier, averaged 14.54p. The calculator uses 4.39p because it is the average of the tariffs offered without strings. If a supplier has offered you more, enter it.

Up to 50 kW, suppliers need an MCS certificate "or equivalent". Above 50 kW, Ofgem says suppliers "have discretion in how they satisfy themselves that the installation is suitably certified", so agree what proof your supplier wants before the system goes in.

The lesson for a business: export is a bonus, not the business case. Size the system to what you use in working hours, and treat export income as a top-up.

How much roof per kW, and how many panels?

A current 580 W commercial panel measures 2,278 × 1,134 mm, so each kW of panels takes about 4.45 m², or about 1.7 panels. That is panel area. The roof area you need is larger, because of the 1 metre edge margin, rooflights, plant, walkways and, on flat roofs, the gaps between rows.

How many kW a roof takes on the calculator's assumptions (10% obstruction allowance):

Roof areaPitched or low-pitch, or flat east-westFlat, south-facing frames
300 m²about 47 kWpabout 29 kWp
750 m²about 130 kWpabout 79 kWp
1,500 m²about 272 kWpabout 166 kWp

So a rough rule for a mid-size roof: about 6 m² of roof per kW on a pitched, metal or east-west flat roof, and about 9.5 m² per kW for south-facing frames on a flat roof. A 50 kW system needs a roof of roughly 300 to 500 m², and 100 kW roughly 600 to 950 m², depending on layout.

On a flat roof, east-west fits far more panels. South-facing frames make more per panel, but need wide gaps so one row doesn't shade the next. If you want the most kWh from a flat roof, east-west usually wins; if you want the best output per panel, south wins. The calculator lets you try both.

A structural survey decides what the roof can actually carry. Older metal roofs, fragile rooflights and asbestos cement sheets can rule out panels on part or all of a roof.

How much solar do I need for 30 kWh a day? A business using 30 kWh between 7am and 7pm on each working day needs a system whose daily output matches that in the months that matter. With a yearly output of about 785 kWh per kW in the Midlands, a kW of panels makes about 3.9 kWh on an average June day and well under 1 kWh in December. A system of roughly 8 to 10 kWp would cover 30 kWh on most summer days without much export. Put your own figures into the calculator for a site-specific answer.

Tax and business rates on commercial solar

Capital allowances. Solar panels are special-rate plant. GOV.UK lists solar panels in the special rate pool, which gets 6% a year writing down allowance. But the Annual Investment Allowance comes first, and "the AIA amount is £1 million". For most businesses that means the whole cost of a commercial roof system can be deducted from taxable profit in the year you buy it. Companies spending more than £1 million can claim a 50% first-year allowance on the excess: "If your claim is for special rate plant or machinery you can deduct half of the cost under the 50% first-year allowance". The remainder goes into the special rate pool.

Two allowances people get wrong:

  • Full expensing (100% first-year relief with no cap) is for main rate plant only. Solar panels are special rate, so they get the 50% first-year allowance instead.
  • The 40% first-year allowance from 1 January 2026 applies only to items that qualify for the main rate, so it does not apply to solar panels.

The calculator shows the amount you could deduct in year one, not the tax saved, because that depends on your tax rate. It is not in the payback, which makes the payback shown conservative for a profitable business. Our solar panels capital allowances guide explains the claim in detail. Not tax advice: check with your accountant.

VAT. Business premises pay the standard 20% VAT on solar. The 0% rate on energy-saving materials covers homes and, from 1 February 2024, buildings used solely for a relevant charitable purpose, and runs to 31 March 2027. A VAT-registered business normally reclaims the VAT, and the calculator starts with "VAT-registered?" set to Yes, so its costs are before VAT. Switch it to No if you can't reclaim VAT.

Business rates in England. On-site solar does not raise your rateable value in England. The rating regulations exclude "excepted renewables plant and machinery", which covers plant where the energy source is "mainly or exclusively… photovoltaics", for "any day before 1st April 2035". Wales, Scotland and Northern Ireland set their own rating rules, so check with your local rating authority or assessor there.

Grid connection and planning permission for commercial solar

Grid connection. Every business system has to go through your network operator's connection process. The operator's procedure (we quote National Grid Electricity Distribution's) splits it in two. G98 covers small, fully type-tested systems up to 16A per phase, which you register within 28 days of switching on. That is 3.68 kW per phase, or about 11 kW on a three-phase supply. Anything bigger needs a G99 application, with a simplified route for systems up to 50 kW on three-phase. Above 50 kW the application is fuller; on a weak local network it can bring an export limit or a reinforcement charge. Your installer handles the application; ask early what your site's connection will allow.

Planning in England. Most business roof solar is permitted development under Class J of the General Permitted Development Order, so it doesn't need a full planning application. The rules that matter:

  • Panels must stay at least 1 metre from the roof's edges.
  • On a flat roof, they can't stand more than 1 metre above the highest part of the roof.
  • On a pitched roof, they can't stick out more than 0.2 metres from the slope.
  • Listed buildings, their grounds and scheduled monuments are excluded.

The old 1 MW limit on non-domestic roofs was removed on 21 December 2023, so big warehouse and factory roofs no longer need full planning permission on size alone.

Above 50 kW (anything bigger than "microgeneration") you must first apply to the council for a decision on whether its prior approval is needed "as to the design or external appearance of the development, in particular the impact of glare on occupiers of neighbouring land". If the council hasn't replied within 56 days, you can go ahead. It's a lighter process than a planning application, but it isn't optional. Systems of 50 kW or less don't need this step. Wales, Scotland and Northern Ireland have their own permitted development rules: ask your council's planning team before you commit.

Solar on a leased building

You can put solar on a building you rent, but you need the landlord's written consent, and the lease has to run long enough for the system to pay off. If payback is seven years and your lease ends in four, buying outright is a gift to your landlord unless you agree terms.

Questions to settle with the landlord before you get a quote:

  1. Who owns the panels, and what happens to them when the lease ends: removal, transfer or sale to the landlord?
  2. Who pays if the roof needs repairs under the panels?
  3. Does the roof's insurance and the building's fire strategy allow them?
  4. Will the landlord extend the lease, or take on the system and its savings in a new one?

A PPA on a leased building needs the landlord to agree to the funder's equipment staying on the roof for the full term. Expect a funder to ask for that before it makes an offer.

When commercial solar isn't worth it, or this estimate will be wrong

Solar is not right for every business, and we would rather you knew now.

Don't bother if:

  • You use most of your power at night or at weekends and are shut on sunny days.
  • You expect to leave the building before payback.
  • The roof needs replacing within the next few years. Fit solar after the new roof, not before.
  • The roof is heavily shaded by taller buildings or trees.

The estimate will be wrong if:

  • Your roof is shaded. The figures assume none.
  • Your use is very peaky, with big loads early morning or evening and little at midday. Real self-use will be lower than shown.
  • Your quote above 50 kW is much cheaper per kW than the government's 10-50 kW figure. The payback here will be too long; enter the real price.
  • Your roof can't carry the weight or needs strengthening. The cost shown excludes structural work.
  • Your network operator limits export or asks for reinforcement.
  • You're in Northern Ireland: the cost figures come from Great Britain.

A battery can lift self-use on sites that are shut at weekends or peak in the evening. The calculator doesn't model one. Our commercial battery storage guide covers when one pays.

How to get a full commercial solar quote

The calculator is built to give you a first number in about a minute. A quote you can sign takes a site visit. Here is what a proper quote should be built on:

  1. Half-hourly data. Ask your supplier for 12 months of half-hourly readings, or at least 12 monthly bills. The installer models your real load against the solar output hour by hour.
  2. A roof survey. Structure, condition, fragile rooflights, access and fire walkways.
  3. A grid check. What your connection allows and whether G99 or reinforcement is needed.
  4. A design and yield figure. Output per year, with shading assessed, from a named method.
  5. A priced breakdown. Panels, inverters, mounting, scaffolding or access, electrical work, the grid application, monitoring and warranties.
  6. Buy and PPA side by side, if your site suits a funder, so you can compare the offer against the level price.

Use the button under your estimate and we will pass your answers to one vetted installer for your area, so you don't have to type them twice. See how we choose them on our commercial solar installers page.

Solar for your kind of business

The calculator works for any roof, but each type of building has its own quirks:

Sources checked 20 November 2026

  1. MCS. Irradiance Datasets (workbook, uploaded February 2025). mcscertified.com/?standard=irradiance-datasets
  2. MCS. MIS 3002: The Solar PV Standard (Installation), Issue 6.0, 18 March 2026, Appendix B and Table 2. mcscertified.com/wp-content/uploads/2026/03/MIS-3002_Solar-PV-Systems-V6.0-Final.pdf
  3. BRE. SAP 10.2, Version 10.2 (11-04-2023), Table U6 (postcode regions), used for two rows misprinted in MIS 3002. bregroup.com/sap/sap10
  4. European Commission Joint Research Centre. PVGIS 5.3 (PVGIS-SARAH3, 2005 to 2023), monthly energy output and average daily irradiance profile, queried 20 November 2026. re.jrc.ec.europa.eu/pvg_tools/en/
  5. Department for Energy Security and Net Zero. Solar photovoltaic (PV) cost data, 2025/26, updated 28 May 2026 (TIC basis workbook used; DNC basis workbook cited for comparison). www.gov.uk/government/statistics/solar-pv-cost-data
  6. Department for Energy Security and Net Zero. Gas and electricity prices in the non-domestic sector (Quarterly Energy Prices tables 3.4.1 and 3.4.2), Q2 2026 provisional, published 29 September 2026. www.gov.uk/government/statistical-data-sets/gas-and-electricity-prices-in-the-non-domestic-sector
  7. Ofgem. Smart Export Guarantee (SEG). www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg
  8. Ofgem. Smart Export Guarantee Annual Report, SEG Year 5 (1 April 2024 to 31 March 2025), December 2025. www.ofgem.gov.uk/transparency-document/smart-export-guarantee-annual-report-april-2024-march-2025
  9. Department for Energy Security and Net Zero. Electricity generation costs 2025, published 14 January 2026, updated 18 March 2026, report and Annex A (fixed O&M for 2030 projects, 2024 prices). www.gov.uk/government/publications/electricity-generation-costs-2025
  10. Arup for DESNZ. Renewable Energy Generation Cost and Technical Assumptions – Onshore Wind and Solar PV: Cost of Electricity Report Update 2024, Final Version, 14 July 2025. assets.publishing.service.gov.uk/media/68ba91f411b4ded2da19fe92/onshore-wind-and-solar-pv-cost-electricity-report-update-2024.pdf
  11. JinkoSolar. Tiger Neo N-type 72HL4-BDV 560-580 W datasheet (JKM560-580N-72HL4-BDV-F6-EN). jinkosolar.com/uploads/JKM560-580N-72HL4-BDV-F6-EN.pdf
  12. Department for Energy Security and Net Zero. Greenhouse gas reporting: conversion factors 2026, full set, published 11 June 2026. www.gov.uk/government/publications/greenhouse-gas-reporting-conversion-factors-2026
  13. Government Commercial Agency. RM6289 Provision of Power Purchase Agreement. www.gca.gov.uk/agreements/RM6289
  14. GOV.UK. Work out your writing down allowances: rates and pools. www.gov.uk/work-out-capital-allowances/rates-and-pools
  15. GOV.UK. Capital allowances: Annual Investment Allowance. www.gov.uk/capital-allowances/annual-investment-allowance
  16. HM Revenue & Customs. Check if you can claim full expensing or 50% first year allowances, updated 20 March 2024. www.gov.uk/guidance/check-if-you-can-claim-full-expensing-or-50-first-year-allowances
  17. HM Revenue & Customs. VAT on energy-saving materials and heating equipment (VAT Notice 708/6), updated 31 January 2024. www.gov.uk/guidance/vat-on-energy-saving-materials-and-heating-equipment-notice-7086
  18. legislation.gov.uk. The Valuation for Rating (Plant and Machinery) (England) (Amendment) Regulations 2022 (SI 2022/405). www.legislation.gov.uk/uksi/2022/405/made
  19. legislation.gov.uk. The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 14, Class J (current text). www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14
  20. National Grid Electricity Distribution. G98 connection procedures and G99 connection procedures. connections.nationalgrid.co.uk/g98-connection-procedures/ · connections.nationalgrid.co.uk/g99-connection-procedures/
  21. EC&M. Solar Photovoltaic Systems, Part 2 (on National Electrical Code section 705.12, US). www.ecmweb.com/code-basics/solar-photovoltaic-systems-part-2-0

Commercial solar calculator questions

How much does commercial solar cost per kW in the UK in 2026?

About £1,167 per kW for a 10-50 kW non-domestic system, the average in the government's 2025/26 solar cost data, including VAT where it applied. For a VAT-registered business that suggests roughly £973 to £1,167 per kW before VAT. There is no official figure above 50 kW, but within its 0-50 kW data the government finds cost per kW falls as systems get bigger.

How much does a 50kW or 100kW commercial solar system cost?

On the government's 10-50 kW figures, a 50 kW system costs about £48,600 to £58,400 before VAT for a VAT-registered business. A 100 kW system would cost up to about £97,300 to £116,700 on the same figures, but no official price exists above 50 kW and real quotes are likely to be lower per kW, if the DESNZ trend to 50 kW continues. Enter your quote in the calculator to see your payback.

What is the payback period on commercial solar?

In our four worked examples, from about 4.3 to 7.9 years. The biggest factor is how much of the solar you use on site, because each kWh used saves your unit rate (about 28.59p for many businesses) while each kWh exported earns about 4.39p. A site with heavy use through the working day, six or seven days a week, pays back fastest.

Is it better to buy commercial solar or take a PPA?

If you can fund it, buying usually earns more: in our worked examples, more than twice as much in cash over 25 years as a PPA priced at 70% of the grid rate. A PPA wins only if its price is below the level price the calculator shows, which was 5.5p to 8.0p per kWh in our examples with no discount rate, and rises once you enter your cost of capital. A PPA suits businesses that want the saving without spending capital.

How many solar panels does my business need?

Each 580 W panel is about 0.58 kW, so a 50 kW system needs about 87 panels and 100 kW about 173. Size the system to what you use in working hours, not to the whole roof, unless your daytime demand is large enough to use the output. The calculator picks the size with the best 25-year return for your use.

How much roof do I need per kWp?

About 4.45 m² of panel per kW, and roughly 6 m² of roof per kW once you allow for edge margins and obstructions on a pitched, metal or east-west flat roof. South-facing frames on a flat roof need about 9.5 m² of roof per kW because of the gaps between rows.

How much will I earn from exporting solar power?

Ofgem's latest report puts the average untied Smart Export Guarantee rate at 4.39p per kWh, with a range of 1p to 12p. Suppliers set their own rates and terms, and the SEG covers systems up to 5 MW in Great Britain only. Export is a top-up, not the reason to buy.

What is the 20% rule for solar panels?

It isn't a UK rule or regulation, and no UK body defines it. Online it usually means sizing a system about 20% above your use. For a business it points the wrong way: a kWh exported earns about 4.39p while a kWh used saves about 28.59p, so size to what you use in working hours and treat export as a bonus.

What is the 120% rule for solar panels?

It is a US electrical code rule (National Electrical Code section 705.12) that limits how much solar current can feed back into a building's main panel: the panel's main breaker plus 125% of the solar output current must not exceed 120% of the busbar's rating. It does not apply in the UK. Here, the installer's electrical design and your network operator's G98 or G99 connection rules decide what can be connected.

Do you need planning permission for commercial roof solar?

In England, usually not: most business roof systems are permitted development, with no size cap since 21 December 2023. Above 50 kW you must first ask the council whether it needs to give prior approval on design, appearance and glare (it has 56 days to answer). Listed buildings are excluded. Wales, Scotland and Northern Ireland have their own rules.

How accurate is this calculator, and how do I get a full quote?

It uses published averages for sunlight, cost and prices, so treat it as a sound first estimate, not a quote. Shading, a peaky load, roof condition and grid limits can all change the answer. Use the button under your result and one vetted installer will survey your site, model your half-hourly data and give you a fixed quote.

Turn this estimate into a full quote

We pass your details to one installer only. We may receive a fee from the installer we introduce you to.

Work out my estimate →