Power factor correction: key facts for 2026
What is power factor correction?
Equipment with coils in it, such as motors, transformers, compressors and magnetic lighting ballasts, needs two kinds of power. Real power (kW) does the work. Reactive power (kVAr) builds the magnetic field the equipment needs to run, and flows back and forth without doing useful work.
Your power factor is real power divided by the total (apparent) power, kVA. A site at 0.80 is drawing 25% more current than a site at 1.0 for the same work. That extra current heats cables and transformers, uses up your supply capacity and costs the network money, which is why it's charged for.
Power factor correction (PFC) adds capacitors that supply reactive power locally. Automatic units switch capacitor stages in and out as your load changes, holding the power factor close to 1.0 so the network sees a cleaner load.
Reactive power charges: how to check your bill
Distribution network operators publish a charging statement every year. Electricity North West's 2026/27 statement is a clear example: when a half-hourly metered supply's reactive power in kVArh exceeds 33% of its active power in kWh in any half hour, excess reactive power charges apply. That threshold is the same as an average power factor of 0.95. Every reactive unit above 33% is charged at the published rate for your tariff.
- Are you half-hourly metered? Larger sites are. Your bill or contract will say so, and your MPAN will start with a profile class of 00.
- Find the reactive line. Look for "reactive power", "excess reactive power", "kVArh" or "power factor" on the bill or the supplier's itemised breakdown. Some suppliers pass it through inside a combined network charges line, so ask them to itemise it.
- Look at 12 months. Reactive charges move with season and production. One month can mislead.
- Ask for your half-hourly data. Your supplier or data collector can provide kWh and kVArh by half hour. That's what an installer needs to size a unit properly.
Not half-hourly metered? Most small sites aren't charged for reactive power at all, so power factor correction rarely pays on bills alone. It can still free up capacity on a supply that's near its limit, which can be cheaper than a supply upgrade.
Power factor correction units and capacitors
| Type | What it is | Suits |
|---|---|---|
| Fixed capacitors | A capacitor fitted to an individual motor or transformer | A few large motors that run at a steady load |
| Automatic capacitor bank | A cabinet at the main board with a controller that switches capacitor steps in and out | Most commercial and industrial sites with changing loads |
| Detuned capacitor bank | An automatic bank with reactors that protect it from harmonics | Sites with variable-speed drives, UPS, LED drivers and other electronics |
| Active harmonic filter | Electronic correction of power factor and harmonics | Sites with heavy electronic loads and harmonic problems |
Harmonics matter more than they used to. Modern sites have drives, chargers and LED drivers that distort the current, and a plain capacitor bank can resonate with them and fail early. A proper survey logs harmonics as well as power factor, and specifies a detuned bank where needed.
Power factor correction cost and payback, with real 2026/27 rates
The network charge is worked out each half hour with a simple formula, set out in BEAMA's guide to power factor correction: chargeable kVArh = total kVArh minus (0.33 x total kWh). Only reactive units above that line are billed, and only while you are importing. Here are the 2026/27 rates from two network operators' own schedules of charges:
| Network operator (2026/27) | LV Site Specific | HV Site Specific | Capacity charge, LV Site Specific |
|---|---|---|---|
| Electricity North West | 0.173p per kVArh | 0.072p per kVArh | 6.92p per kVA per day |
| National Grid Electricity Distribution, West Midlands | 0.114p per kVArh | 0.027p per kVArh | 10.66p per kVA per day |
Rates differ by region and voltage, and your supplier may add its own margin when it passes them through, so read the figure on your own bill. Other operators publish the same Annex 1 table each year.
Worked example 1: the reactive charge
An LV half-hourly site in the North West uses 100,000 kWh a month and its meter records 60,000 kVArh, an average power factor of about 0.86. For simplicity we treat the month as one block (the real sum is done half hour by half hour):
- Allowance: 0.33 x 100,000 = 33,000 kVArh
- Chargeable: 60,000 minus 33,000 = 27,000 kVArh
- Cost at 0.173p: 27,000 x 0.173p = £46.71 a month, about £560 a year
- The same site in the West Midlands at 0.114p: 27,000 x 0.114p = £30.78 a month, about £369 a year
That's the honest picture: per unit, the excess reactive charge is small. It only becomes a big number on large, motor-heavy sites with millions of kWh, or where a supplier marks it up.
Worked example 2: the capacity saving, often the bigger prize
Your capacity charge is billed on kVA, and poor power factor inflates kVA. Take a site with a peak of 400 kW:
- At power factor 0.86: 400 / 0.86 = 465 kVA
- Corrected to 0.98: 400 / 0.98 = 408 kVA, about 57 kVA less
- Capacity charge at Electricity North West's LV rate: 6.92p x 365 days = £25.26 per kVA per year
- 57 kVA x £25.26 = about £1,440 a year, if you ask your network operator to lower your agreed capacity
Lowering agreed capacity is a request to your network operator, and getting it back later isn't guaranteed, so only do it with headroom. The same kVA reduction can also avoid an exceeded capacity charge, or a supply upgrade on a site that is growing.
What drives the price of the unit
- kVAr rating and number of steps, sized from your logged data.
- Standard or detuned. Detuned costs more, and is usually needed on modern sites.
- Installation: connection at the main board, a short shutdown and commissioning.
- Logging before, and a check after to show the charge has gone.
We haven't found a public price list we'd stand behind, so we don't quote a pound figure for the unit. The test is simple: add the reactive charge and any capacity saving from your own bills, divide the installed price by that annual total, and you have the payback in years. Ask any installer to show that sum on your bills before you sign.
On tax, a PFC unit is part of your electrical installation. HMRC treats electrical systems as integral features (special-rate plant), but the £1 million Annual Investment Allowance can write off the cost in the year you buy. Check with your accountant.
How a power factor survey works
A proper quote starts with data, not a walk round with a clipboard. Expect three stages:
- Bill and data review. The installer reads 12 months of bills to find the reactive charge, then asks for your half-hourly kWh and kVArh data from your supplier or data collector. That shows when the power factor drops (often nights and weekends, when motors idle and the lighting load is low) and how much kVAr is missing.
- On-site logging. A three-phase power quality analyser is clipped onto the main incomer, usually for at least a week so it sees a full production cycle, including the weekend. It records power factor per phase, kW, kVA, kVAr, voltage and the harmonic content of the current (THD and individual harmonics). If harmonic distortion is high, that changes the kind of unit you need.
- Sizing and specification. From the log, the installer works out the kVAr needed to lift the worst half hours to your target, usually 0.95 to 0.98, picks the step sizes so the controller can track your load, and decides between a standard and a detuned bank. Ask for the target power factor, the kVAr rating, the step layout and the predicted annual saving in writing.
After commissioning, the same half-hourly data proves the result: kVArh as a share of kWh should sit under the 33% line, and the reactive line on your bill should shrink or disappear from the next full billing month.
Harmonics and detuned PFC units
Twenty years ago a factory's load was mostly motors and magnetic lighting. Today it's full of variable-speed drives, UPS systems, LED drivers, EV chargers and solar inverters. If you're adding drives, our variable speed drives guide shows the fan and pump savings and what drives do to your supply. These draw current in pulses, which adds harmonics: currents at multiples of 50 Hz (250 Hz for the 5th, 350 Hz for the 7th, and so on).
A capacitor's impedance falls as frequency rises, so a plain capacitor bank soaks up harmonic current. Worse, the capacitors and your supply transformer can form a resonant circuit near one of those harmonics and amplify it. The symptoms are capacitors that swell, fuses that blow, overheating and nuisance tripping on other equipment.
A detuned bank puts a reactor (an inductor) in series with each capacitor step, tuning the combination below the lowest significant harmonic so it can't resonate there. The two common settings are a 7% reactor, which tunes each step to about 189 Hz, safely below the 5th harmonic at 250 Hz, and a 14% reactor, about 134 Hz, used where the 3rd harmonic is significant. The IET notes another trap: some inverters are quoted with a power factor better than 0.95 when the true figure, harmonics included, is far lower. If your survey shows significant harmonic distortion, a detuned bank is the minimum. Where harmonics are a problem in their own right, an active harmonic filter treats both.
When power factor correction is not worth buying
Not every site needs it, and a salesperson won't always tell you. Hold off if:
- You're not half-hourly metered. Smaller supplies aren't charged for reactive power, so there's nothing on the bill to remove.
- There's no reactive charge on your bills. If 12 months of itemised bills show no excess reactive line, your power factor is already above the threshold most of the time. Correction would only pay if you need to free up supply capacity.
- Your power factor is already 0.95 or better. Raising 0.96 to 0.99 earns almost nothing, because charges only apply above the 33% line.
- Your site already has correction fitted. Check it works before buying new: failed capacitor steps and blown fuses are common in old cabinets, and a service and repair often costs far less than a new unit.
- Your load is mostly electronics. LED lighting, IT and modern drives with front-end correction often run at a good power factor already, and a standard bank on that kind of site can cause harmonic trouble.
Where you do see a charge, it's one of the quickest paybacks in commercial energy, because the saving is a line on a bill you can point to, not a modelled percentage.
Power factor correction with solar panels and battery storage
Solar can make your power factor worse. Commercial solar panels supply real power (kW) to your site, so you import fewer kWh from the grid. Your motors still need the same reactive power, and most inverters run at unity power factor by default, so the grid still supplies all the kVAr. With fewer kWh in each half hour and the same kVArh, the ratio climbs past 33% and the reactive charge can appear, or grow, on a sunny day. Factories and warehouses adding a large array, such as on factory roofs or warehouse roofs, should log power factor before and after, and size any correction with the array in the model.
Inverters can help. Many modern solar and battery inverters can be set to supply reactive power. Whether that is allowed, and at what settings, is agreed with your network operator in the G99 connection application, so raise it at design stage rather than after the event.
Batteries and capacity. Commercial battery storage cuts peak kW and kVA demand, and PFC cuts kVA by removing reactive current. Together they can keep a growing site inside its agreed supply capacity without an expensive upgrade.
Do it as part of a wider energy survey
The same site visit can cover several measures, and they affect each other:
- Voltage optimisation suits the same motor-heavy sites with older lighting, and the same logger can measure your voltage at the same time.
- An LED lighting upgrade removes magnetic ballasts, which can improve power factor on its own. Do the LED work first or size the PFC with it in mind, or you may buy kVAr you no longer need.
- A business energy audit ranks all of these by payback, and large companies can use their ESOS assessment to flag reactive charges as an opportunity.
- Funding: there's no national PFC grant, but our guide to business energy grants and council energy grants list the loans and local funds that can cover measures from an energy survey.
Sources checked 20 November 2026
- Electricity North West: Use of System Charging Statement 2026/27 (excess reactive power above 33% of kWh, power factor 0.95)
- Electricity North West: schedule of charges 2026/27 v1.1 (Annex 1: reactive power p/kVArh, capacity p/kVA/day)
- National Grid Electricity Distribution (West Midlands): schedule of charges 2026/27 (Annex 1)
- BEAMA: guide to power factor correction (chargeable kVArh = total kVArh minus 0.33 x total kWh)
- IET: power factor correction (typical 0.95 target; inverter power factor claims)
- Published reactor manufacturer data: 7% detuning = 189 Hz, 14% = 134 Hz
- GOV.UK: Annual Investment Allowance (£1 million)
- HMRC Capital Allowances Manual CA22320: integral features (electrical systems)
Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.