Voltage optimisation: key facts for 2026
How voltage optimisation works
Electricity in Great Britain is supplied at a declared 230V. Under regulation 27 of the Electricity Safety, Quality and Continuity Regulations 2002, your network operator can let it drift 10% above or 6% below that, so anywhere from about 216V to 253V is legal. Most equipment sold in Europe is designed to run happily at 220V to 230V.
A voltage optimiser (also called a voltage optimisation unit, voltage management or voltage reduction) is a transformer installed between your main incomer and your distribution boards. It brings the voltage down by a fixed amount, or holds it at a set point if it's an electronically controlled unit. Your equipment then runs at the voltage it was built for, not at whatever the grid happens to be sending.
The saving comes from physics. On a simple resistive or inductive load, power rises with the square of voltage. SEAI's verification guidance puts it plainly: cutting a site from 240V to 220V could in theory save about 15% on those loads. The catch is that only some loads behave that way.
Which equipment saves, and which doesn't
| Equipment | Saves with voltage optimisation? | Why |
|---|---|---|
| Fluorescent tubes with magnetic (wire-wound) ballasts | Yes | Power falls as voltage falls. Light output can dip slightly |
| Sodium, mercury and metal halide high bays | Yes | Common in older warehouses and factories |
| Fixed-speed motors (fans, pumps, compressors) | Sometimes | Only where the motor is oversized and lightly loaded. A 10% voltage cut reduces torque by about 19%, so a fully loaded motor can overheat |
| Incandescent and halogen lamps | Yes | Rare on commercial sites now |
| LED lighting | No | LED drivers draw the same power at any voltage |
| Fluorescents with electronic ballasts | No | The ballast regulates its own output |
| Motors on variable-speed drives | No | The drive holds power constant and draws more current at lower voltage |
| IT, servers, chargers, modern electronics | No | Constant-power supplies. If they're 30% or more of your load, the circuits need checking for extra current |
| Heaters, ovens, kettles | Not really | They draw less power but run longer to reach the same temperature, so the energy used barely changes |
The rule of thumb: the older your lighting and the more fixed-speed motors you run, the better voltage optimisation looks. If you've already done a full LED retrofit and fitted drives to your big motors, put the money into solar or battery storage instead.
Is voltage optimisation worth it? A quick test
Answer these five questions before you take a sales call. Three or more "yes" answers and a proper survey is worth your time.
- Is your incoming voltage high? A logger on your main board for a week will show it. Sites regularly above 240V have the most to gain. Sites already around 230V have very little.
- Do you still have fluorescent or high-bay lighting? Old tubes with magnetic ballasts and sodium high bays are the biggest winners.
- Do you run fixed-speed motors for long hours? Ventilation fans, pumps, refrigeration and compressors that run without drives.
- Is your electricity spend large? A single-digit percentage saving needs a big bill to pay back a transformer and an installation.
- Are you staying put? A voltage optimiser is a fixed asset. Payback depends on years of savings at the same site.
Be wary of anyone quoting a saving before they've logged your voltage and listed your loads. A good installer measures first, models the saving on your actual equipment, and agrees how the saving will be verified afterwards with metering, not with a brochure figure.
What voltage optimisation costs
Price depends on the size of your supply, not the size of your building. The unit is sized in kVA to match your incoming supply and maximum demand, and a three-phase commercial unit needs a shutdown to install, usually out of hours. What goes into the quote:
- The unit itself, sized to your supply capacity (kVA), with a bypass so the site can run if it's ever taken out of service.
- Fixed or electronic regulation. Fixed-ratio units are simpler and cheaper. Electronically regulated units hold a set voltage however the grid moves, and usually cost more.
- Installation: the shutdown, cabling between the incomer and your boards, and any space or ventilation the unit needs.
- Logging and verification: a week or more of voltage and load logging before, and metering after so you can see the saving.
Indicative prices and a worked payback
Business Energy Scotland, the Scottish Government-funded advice service, says typical installations range from £2,000 to £5,000. Large multi-hundred kVA units on industrial supplies cost more, so treat that as a guide for smaller commercial sites. BEAMA, the electrical manufacturers' trade body, puts average savings at around 13%, but that is an industry average across suitable sites, not a promise for yours.
Here's how to do the sum properly, applying the saving only to loads that respond. The 10% saving and 25p per kWh price are assumptions for the example, so swap in your own logged figures and tariff:
- Annual use: 200,000 kWh
- Voltage-dependent share (old lighting, fixed-speed motors): 40%, so 80,000 kWh
- Saving on those loads at 10%: 8,000 kWh a year
- At 25p per kWh: 8,000 x £0.25 = £2,000 a year
- Payback on a £5,000 installation: 5,000 / 2,000 = 2.5 years
Now run the same site after an LED retrofit has taken the voltage-dependent share down to 10%: 20,000 kWh x 10% = 2,000 kWh, or £500 a year, and the payback stretches to 10 years. That's why the order you do things in matters.
Ask for the price, the predicted annual kWh saving on your loads, the payback in years, and how the saving will be measured. If the installer won't commit to the last one, keep looking.
On tax, a voltage optimiser forms part of your building's electrical system. HMRC treats electrical systems as integral features, which are special-rate plant, but the £1 million Annual Investment Allowance can still write the full cost off against profits in the year you buy it. Check the detail with your accountant.
Are there voltage optimisation grants?
There is no national voltage optimisation grant in England, Scotland or Wales in 2026. The routes that can help are:
- Northern Ireland: NISEP. The Commercial Energy Saving Scheme lists voltage optimisation among its measures, at a 20% grant with 80% paid by the business. Power NI runs it. The 2026/27 round has closed for applications, and the next is expected in April 2027, subject to funding. See Northern Ireland business energy grants.
- Scotland: SME Loan. Business Energy Scotland says voltage optimisation is eligible for funding through its SME Loan Scheme. Check whether your project qualifies on our Business Energy Scotland page.
- Wales: Green Business Loan Scheme. The Development Bank of Wales lends for energy-saving projects. See Welsh business energy grants and loans.
- Local council funds. Some councils part-fund energy-saving capital projects identified in an energy survey. See local council business energy grants.
Every other route is about tax and bills: the Annual Investment Allowance, and a lower electricity bill that starts the day it's switched on. A free business energy audit will usually tell you whether voltage optimisation ranks above LED, drives or solar on your site.
How a voltage optimisation survey should work
A credible saving figure comes from measurement on your site. A good survey has four parts:
- Voltage and load logging. A three-phase power quality logger on the main incomer for at least a full working week, weekend included. It records voltage on each phase, current, kW, power factor and harmonics. You want the average, the minimum and when the peaks happen, because the lowest voltage sets how far the unit can safely step down.
- A load inventory. Walk the site and list what's on each board: lighting type and ballast, motors with and without drives, refrigeration, IT, heating. This splits your consumption into the loads that save and the loads that don't. A site where most of the kWh are LED and drives can be ruled out at this stage.
- A modelled saving on your loads. Apply the voltage reduction only to the voltage-dependent share of your consumption, not to the whole bill. Your half-hourly data from your supplier helps here.
- An agreed measurement plan. SEAI's verification guidance expects sub-metering or a before-and-after comparison, and BEAMA suggests three months of half-hourly data before and after, or repeated on/off tests with the unit switched in and out. Agree the method before you sign, so the saving is something you can check.
When voltage optimisation is a waste of money
The IET's verdict on voltage optimisation is "a qualified yes, but not for all types of load", and applied to the wrong site it can be a waste of money. Skip it, or at least don't buy it yet, if any of these describe your site:
- Your lighting is already LED. LED drivers draw the same power whatever the voltage, so the lighting saving that sold voltage optimisation in the 2000s has gone.
- Your big motors run on variable-speed drives. The drive already sets the motor's voltage and speed. Lowering the supply just makes the drive pull more current. If your fans and pumps don't have them yet, our variable speed drives guide shows how to work out that saving.
- Your supply already sits near 230V. If logging shows a steady 228V to 232V, there's little to take off before you approach the 216V legal minimum at the far end of your cables.
- Your load is mostly IT, heating or electronics. Offices, data rooms and heated spaces see little or nothing. The Ministry of Defence's practitioner guide warns that constant-power equipment draws more current at lower voltage, and protective devices can trip.
- You're planning an LED or drives upgrade anyway. Do those first. They usually save more, and they shrink the voltage-dependent load the optimiser relies on.
- You're leaving the site in a year or two. A transformer bolted into your switchroom stays with the building.
For a site like this, the money usually works harder in LED lighting, rooftop solar or a full energy audit that finds the real waste.
Voltage optimisation with solar panels and batteries
Solar raises voltage. When an array exports, its inverters push the voltage up at your connection point, and an inverter will trip off if voltage rises above its protection limit. On a site that already runs high, that can cost you generation on sunny days. Where the inverters connect relative to the optimiser matters: upstream they see the full grid voltage, downstream they export back through the transformer. Neither is automatically right, so tell any installer about existing or planned solar so the wiring, the unit's position and the inverter settings are designed together. For large arrays on factory or warehouse roofs, the network operator reviews this in the G99 application.
Solar also shrinks the saving. Voltage optimisation saves a share of the kWh you import. Every kWh you generate yourself is one the optimiser no longer saves money on, so model the two together rather than adding their brochure savings.
Batteries don't change the voltage case much. Commercial battery storage saves money by shifting when you import and cutting peaks, not by changing how much power your equipment draws. It can sit alongside an optimiser, but it doesn't make one more or less worthwhile.
What to pair it with
- Power factor correction. Sites with lots of motors often pay reactive power charges too. The same logger can measure power factor and voltage in one visit.
- LED lighting. LED usually saves more than voltage optimisation on lighting, but it removes the voltage saving on those circuits. Do the sums together, not separately.
- ESOS. Large companies have to audit their energy use every four years. If your assessor flags high site voltage, that's your evidence base for a survey.
- Funding. Our business energy grants guide covers every national scheme, loan and tax relief in one place.
Sources checked 20 November 2026
- Electricity Safety, Quality and Continuity Regulations 2002, reg. 27: 230V, +10% / -6%
- SEAI: Voltage optimisation measurement and verification guidance (which loads save, which don't)
- Business Energy Scotland: voltage optimisation quick guide (typical installations £2,000 to £5,000; SME Loan eligible)
- BEAMA: voltage optimisation guide (average savings around 13%; three months of half-hourly data before and after)
- IET: voltage optimisation, 'a qualified yes, but not for all types of load'
- Ministry of Defence Practitioner Guide 01/10: voltage optimisation (constant-power loads and spurious tripping)
- Utility Regulator NI: NISEP list of schemes 2026-27 (Commercial Energy Saving Scheme, p.33)
- GOV.UK: Annual Investment Allowance (£1 million)
- HMRC Capital Allowances Manual CA22320: integral features (electrical systems)
Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.