Display Energy Certificates for public buildings

Display Energy Certificate (DEC): who needs one, the fines and how to lift your rating

If a council, school, NHS trust, college or leisure trust occupies a building over 250m² that the public visits, the law says a Display Energy Certificate must hang where visitors can see it. Unlike an EPC, a DEC grades the energy the building actually used last year, so it moves when you change how the building runs. This guide covers who needs one, how long it lasts, the fines, what it costs, how the rating is worked out, and the measures that move a building up the scale.

Updated 20 November 2026 · Independent guide, not the government's Great British Energy (gbe.gov.uk) · Checked against GOV.UK, Ofgem and scheme sources

250m²Floor area above which a public building visited by the public needs a DEC
12 monthsHow long a DEC lasts on buildings over 1,000m²
£1,000Penalty for having no valid advisory report (£500 for not displaying the DEC)
43%Share of DECs lodged in England and Wales in 2025 rated D or worse
Business, farm, school or charity? You're in the right place. Looking for help with a home? Check home energy grants →

Display Energy Certificates: key facts for 2026

Who needs oneBuildings over 250m² of total useful floor area, occupied by a public authority and frequently visited by the public (England and Wales, reg. 14 of the 2012 Regulations).
How long it lastsOver 1,000m²: 12 months, with a 7-year advisory report. 250m² to 1,000m²: DEC and advisory report both last 10 years.
Penalties£500 for failing to display a valid DEC, £1,000 for not holding a valid advisory report. Trading standards enforce.
What it measuresActual metered energy over 12 months, converted to CO2 per m² and compared with a typical building of the same type. 100 is typical.
Who can produce itOnly an energy assessor accredited for DECs on that category of building, using government-approved software. It's valid once lodged on the register.
Scotland and Northern IrelandScotland uses an EPC on display instead of a DEC. Northern Ireland has DECs, but they last 12 months whatever the size.

What is a Display Energy Certificate?

A Display Energy Certificate (DEC) is a poster-style certificate that shows how much energy a public building really used over the last year, graded from A (lowest carbon) to G (highest). GOV.UK's guidance says the point is to "raise public awareness of energy use and to inform visitors to public buildings about the energy use of a building". It should be displayed "no smaller than A3 in size", usually near the main entrance.

Every DEC comes with an advisory report (the regulations call it a recommendation report) listing ways to cut the building's energy use. The two documents are a pair: the guidance says "a lodged DEC becomes legal when the accompanying advisory report has been lodged, and vice versa".

People search for it in several ways (DEC certificate, DEC energy certificate, display energy certificates). They all mean the same document, produced under the Energy Performance of Buildings (England and Wales) Regulations 2012.

DEC vs EPC: the difference in one table

Display Energy Certificate (DEC)Energy Performance Certificate (EPC)
What it ratesOperational rating: the energy the building actually used over 12 months, from meter readingsAsset rating: the building's theoretical performance, modelled from its fabric and services
When it's neededPublic authority occupies a building over 250m² frequently visited by the publicWhen a building is built, sold or let
Who must have itThe occupierThe seller, landlord or person carrying out the building work
How long it lasts12 months (over 1,000m²) or 10 years (250m² to 1,000m²)10 years
What changes itRunning the building better shows up at the next renewalPhysical changes to fabric, heating, lighting and controls
Minimum standardNone: there's no minimum DEC ratingPrivate landlords face MEES minimums

A public building can need both. The GOV.UK guidance says you only need an EPC if you construct, sell or let the building, but "if you do have an EPC for your building, the rating must be displayed on your DEC". For EPC rules, lettings and the minimum energy efficiency standard, see our guide to commercial EPCs and MEES.

Who needs a DEC? The 250m² rule

Regulation 14 applies "to buildings occupied by public authorities and frequently visited by the public". Since 9 July 2015 that covers every such building with a total useful floor area over 250m² (the line was 500m² from January 2013). A building needs a DEC when all three of these are true:

  1. It's occupied, in whole or in part, by a public authority. GOV.UK's examples: "a council, leisure centre, college or NHS trust". In practice that includes schools, universities, libraries, museums, police and fire stations, town halls and health centres. The methodology confirms the duty binds the Crown too, so central government buildings count.
  2. Its total useful floor area is over 250m². This is "the total area of all enclosed spaces measured to the internal face of the external walls", so it's gross internal area, not lettable area. A part of a building "designed or altered to be used separately" can count as a building on its own.
  3. It's frequently visited by the public.

The building also has to use energy "to condition the indoor climate", meaning it has heating, mechanical ventilation or air conditioning.

Who doesn't need one

  • Private organisations. They "do not need to display a DEC, but may elect to do so on a voluntary basis". Some private landlords and corporate occupiers do this to benchmark buildings.
  • A council building let to a private business. GOV.UK's FAQ answers this directly: "No. The requirement is on the occupier", and the occupier isn't a public authority.
  • Public buildings of 250m² or less, or buildings the public doesn't regularly visit, such as a closed depot or back office.

Shared buildings: if a public authority shares a building with private tenants, the public authority's duty still applies to the building it occupies. Ask your assessor to confirm how the floor area and meters split before you commission anything.

How long does a DEC last?

Total useful floor areaDEC valid forAdvisory report valid forSite visit at renewal?
Over 1,000m²12 months from the nominated date7 yearsNot always: the same assessor can renew without a visit if the occupier declares nothing has changed, but a visit is always needed in a year a new advisory report is produced
Over 250m² up to 1,000m²10 years10 yearsYes, always

The 12-month DEC is the one to plan around. Each year it shows the operational rating for a 12-month period "ending no earlier than three months before the nominated date", plus the ratings from the previous two years, so visitors can see whether the building is improving. A building that cuts its energy use this winter will show it on next year's certificate.

New occupiers get some leeway. Regulation 16 says the operational rating rule doesn't apply until the occupier has been in the building for 15 months, because there isn't a year of meter readings yet.

Changes the government has proposed

In its Energy Performance of Buildings reform consultation (December 2024 to February 2025), the government said it was "considering reducing the validity period of DECs and DEC recommendation reports from 10 years to 7 years for buildings between 250-1,000m², and the validity period of DEC recommendation reports from 7 years to 5 years for buildings over 1,000m²". It also floated raising the £1,000 DEC penalty to £1,630 (inflation adjusted) or £2,000 (double).

Status at 20 November 2026: these are proposals, not law. The January 2026 partial response said a further response on DEC validity periods "will be published in 2026". We couldn't find it on GOV.UK when we checked today. The current validity periods and penalties still apply.

DEC penalties and who enforces them

Enforcement sits with the local weights and measures authority, which is trading standards (regulation 34). The fines are fixed in regulation 38:

BreachPenalty charge
Not displaying a valid DEC in a prominent place clearly visible to the public (reg. 14(3)(b))£500
Not having a valid advisory report in your possession or control (reg. 14(3)(a))£1,000
  • The fines are per breach, so an estate with several lapsed buildings can face several notices. Paying one doesn't fix the problem: the guidance warns that "it will still be necessary to commission the documents, otherwise further offences will be committed".
  • A penalty charge notice can't be given more than six months after the breach, or after the last day of a continuing breach. An expired DEC still on the wall is a continuing breach.
  • You get at least 28 days to pay or ask for a review. If the review upholds the notice, you can appeal to the county court within 28 days.
  • The notice must be withdrawn if you show you "took all reasonable steps and exercised all due diligence" to comply. A booked assessor and a chased lodgement are the sort of evidence that helps.

The bigger cost for most councils and trusts isn't the fine. It's a public D, E or G next to the front door, renewed every year, in a building the public pays to run.

How the DEC operational rating is calculated

The government's methodology, updated on 11 November 2026, sets out the formula:

Operational rating = (building CO2 emissions / building area) x (100 / typical CO2 emissions per unit area)

In plain terms, the assessor takes a year of meter readings for every fuel (gas, oil, grid electricity, district heat), converts each to CO2 using the government's standard factors, divides by floor area, and compares the result with a benchmark for that type of building. The benchmarks come from CIBSE, which has prepared them "for 29 main building categories" such as schools, offices, hospitals and swimming pools.

What 100 means: a rating of 100 is a building performing exactly like a typical one of its type. Zero CO2 gives a rating of 0, and twice the typical emissions gives 200. A net energy generator still scores 0, because the rating can't go below zero.

Operational ratingBandWhat it means
0 to 25AA quarter of typical emissions or less
26 to 50BUp to half of typical
51 to 75CBetter than typical
76 to 100DAround typical
101 to 125EUp to a quarter worse than typical
126 to 150FUp to half worse than typical
More than 150GMore than half worse than typical

The adjustments that can change your number

  • Weather. The benchmark is always adjusted to the heating degree days where your building is, using its postcode. A cold year in Cumbria isn't held against you.
  • Longer hours. If the building is open much longer than the benchmark assumes, the assessor can adjust for it, using attendance records, surveys or published opening hours "signed off by the occupier".
  • Separable energy uses. A few energy-hungry activities that aren't typical of the building type can be taken out. The approved list is short: "regional server room, trading floor, bakery oven, sports flood lighting, furnace, heat treatment or forming process, blast chilling or freezing". Each must be separately metered.
  • On-site generation. Solar panels aren't added back as a credit. Their effect shows up as less grid electricity bought: the methodology says meter readings "are not adjusted". Meter the solar output and it's also shown on the DEC as renewable CO2.

Worked example (illustrative numbers)

Take a 2,000m² building that the assessor's software benchmarks, after weather and hours adjustments, at a typical 60kg CO2 per m² a year. These figures are made up to show the arithmetic; real benchmarks sit in the approved software.

  • Its metered gas and electricity convert to 150 tonnes of CO2, which is 150,000 / 2,000 = 75kg per m².
  • Operational rating = 75 x (100 / 60) = 125, band E.
  • Cut emissions by 20% to 120 tonnes (60kg per m²) and the rating becomes 60 x (100 / 60) = 100, band D.
  • Cut by 40% to 90 tonnes (45kg per m²) and it's 75, band C.

The rule of thumb that follows from the formula: once your building is benchmarked, every 1% off its metered CO2 takes about 1% off the rating. Each band is 25 points wide, so for a building near typical (100), a cut of roughly a quarter in emissions moves it one full band.

How to improve your DEC rating

Because the DEC is built from meter readings, anything that cuts the energy you buy, or swaps it for lower-carbon energy, shows up at the next renewal. This is the part most DEC guides skip. In rough order of cost and speed:

MeasureWhat it changes on the DECTypical speed
Out-of-hours baseloadLess electricity and heat used when the building is shutWeeks
Heating controls or a BMSLess gas from plant running to the wrong hours and temperaturesMonths
LED lighting with sensorsLower electricity all yearMonths
Solar panelsLess grid electricity bought, plus renewable CO2 shown on the DECMonths
Heat pumpsReplaces gas heating with electricity at a lower carbon factorA year or more

1. Find the out-of-hours waste first

Look at half-hourly meter data for a weekend or a school holiday. Whatever the building draws with nobody in it is baseload: ventilation left on, IT, lighting, hot water held at temperature, heating running to a schedule set years ago. GOV.UK's DEC guidance passes on a Carbon Trust figure that "turning off lights and equipment can save around 15 per cent of energy costs", and says "metering and monitoring are at the heart of energy management". Your advisory report's short-payback list (up to three years) usually points here too. Our business energy saving guide shows how to find out-of-hours waste with two meter readings.

2. Fix the heating controls

Heating is the biggest single slice of most public buildings' CO2. Time schedules matched to real opening hours, optimum start, weather compensation and zone control cut gas use without anyone noticing. For larger sites, a building management system ties it together and logs the data your assessor needs. Check first whether you already have one that's been overridden. On ventilation fans and pumps, look at variable speed drives.

3. Switch to LED

Old fluorescent and halogen lighting in sports halls, corridors and classrooms burns electricity for long hours. LED with occupancy and daylight sensors cuts the electricity bought every month, which feeds straight into the rating.

4. Generate on site

Every kWh a roof generates and the building uses is a kWh not bought from the grid, so it comes off the CO2 total. Schools, leisure centres and council offices with large flat roofs and daytime use suit solar well: see school solar panels and battery storage. Fit a generation meter so the output also appears on the DEC.

5. Replace gas heating

Swapping a gas boiler for a commercial heat pump is the largest single move for most buildings, because heating is usually the biggest share of emissions. If boilers are near the end of their life, compare the options on our commercial boiler replacement guide before you buy like for like.

Paying for it

The DEC advisory report: what's in it and how to use it

The advisory report lists recommendations sorted by payback, "generally between five and 10 measures" in each group:

  • Short term (up to 3 years): for example building energy management measures.
  • Medium term (3 to 7 years): for example upgrading building services.
  • Long term (more than 7 years): for example low and zero carbon technologies.

You don't have to act on it: GOV.UK says "you are under no obligation to act on the recommendations". It also says the advice is "for information only" and you should get detailed professional advice before deciding. Each building gets its own report, since the methodology says "a site-wide Recommendation Report is not permitted".

Use it as a brief. Hand the short-term list to your facilities team, and send the medium and long-term items out for quotes with a year of meter data attached. A recommendation with a real price and a payback in front of a budget holder is far more likely to happen than one in a PDF.

Display energy certificate cost

There's no set fee. GOV.UK says "the cost of an assessment varies by assessor and the size of the property". What drives the quote:

  • Floor area and building type. A 600m² library is a smaller job than a 20,000m² hospital block.
  • First DEC or renewal. The first needs a site visit. For buildings over 1,000m², the same assessor can renew without one if nothing has changed (except in a year a new advisory report is due), which usually costs less.
  • Meter data quality. Clean 12-month readings for every fuel are quicker to process than estimated bills, missing months or shared supplies.
  • Separable uses and adjustments. Evidence for extended hours or a separately metered pool or server room adds work, but can lower the rating.
  • Number of buildings. Councils and trusts commissioning a whole estate usually get a per-building rate.
  • A new advisory report. Over 1,000m², the report is renewed every seven years, so some renewals cost more than others.

For scale: the government's 2024 impact assessment for the reforms assumed a non-domestic EPC costs about £400, including survey, travel and lodgement. That's an EPC, not a DEC, so use it only as a reference point. A method: get two quotes from accredited DEC assessors, check each covers lodgement of both documents, and compare the annual cost of keeping a 12-month DEC with the £500 and £1,000 penalties for not having one.

How to get a DEC, or find an existing one

  1. Check what you have. Search the GOV.UK Find an energy certificate service by postcode, street name and town, or certificate number. It covers DECs for public buildings in England, Wales and Northern Ireland.
  2. Find an accredited assessor. Use Get a new energy certificate to find assessors accredited for DECs. Only an assessor "accredited to produce display energy certificates for that category of building" can issue one.
  3. Gather the data. Twelve months of actual meter readings for every fuel, floor plans or areas, opening hours, and meter readings for any solar or separable uses. Readings from your supplier or half-hourly data beat estimated bills.
  4. Assessment and lodgement. The assessor visits (for a first DEC), runs approved software and lodges both documents on the national register. The methodology notes "the documents become valid once lodged on the register".
  5. Display it. At A3 or larger, in a prominent place clearly visible to the public, and diarise the renewal well before the 12 months run out.

To check a certificate is real, enter its reference number on the register. If it isn't there, contact the assessor's accreditation scheme, which is named on the DEC.

Scotland, Wales and Northern Ireland

  • Wales follows the same 2012 Regulations as England, so everything on this page applies.
  • Scotland doesn't use DECs. GOV.UK says "public buildings in Scotland must have an Energy Performance Certificate instead of a DEC". Under regulation 9 of the Energy Performance of Buildings (Scotland) Regulations 2008, a public authority building over 250m² that's frequently visited by the public must display an EPC "in a prominent place clearly visible to visiting members of the public". Scotland has its own register and assessor process.
  • Northern Ireland has DECs under its own 2008 Regulations, with the same 250m² threshold since 9 July 2015, but no 10-year band. Regulation 11 says "a display energy certificate is valid for a period of 12 months" and "an advisory report is valid for a period of 7 years", whatever the size of the building.

How public buildings rate: the national picture

MHCLG's live table of DEC lodgements in England and Wales (published 29 October 2026) shows 38,166 DECs lodged in 2025:

BandDECs lodged in 2025Share
A7842.1%
B5,81615.2%
C15,01839.3%
D10,89028.5%
E3,7029.7%
F1,1172.9%
G8392.2%

So 43% of certificates were D or worse, and only about one in six reached A or B. Shares are our calculation from the published counts. The table counts lodgements, not buildings, but most of the stock is over 1,000m² and renews every year. If your building sits at D or E, it's in a crowded middle that a few well-chosen measures can lift.

When the DEC rules don't apply, and when a rating chase isn't worth it

  • Private occupiers. No duty. A voluntary DEC can be a cheap way to benchmark a building against its type, but it's optional. Large companies have a separate duty to report energy use under SECR, and every kWh they cut also comes off the Climate Change Levy.
  • Small or rarely visited public buildings. At 250m² or less, or with no regular public visitors, the rules don't bite.
  • Chasing a letter for its own sake. There's no minimum DEC rating, so spend where the money and carbon savings are, not on a measure that only nudges the band. A rating that improves because heating plant was switched off for comfort reasons isn't a win.
  • Buildings due for closure or disposal. Keep the DEC valid while you occupy the building, but don't fund long-payback works there.
  • Claiming separable uses you can't evidence. If the pool or server room isn't separately metered, it can't come out of the calculation. Fit a sub-meter first.

Sources checked 20 November 2026

Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.

Display Energy Certificate questions

What is a Display Energy Certificate?

A DEC shows a public building's actual energy use over the last 12 months as an operational rating from A to G, compared with a typical building of the same type. It must be displayed where the public can see it and comes with an advisory report of improvement measures.

Which buildings need a DEC?

In England and Wales, buildings with a total useful floor area over 250m² that are occupied in whole or part by a public authority and frequently visited by the public, such as council offices, schools, libraries, leisure centres and NHS buildings.

How long is a DEC valid?

For buildings over 1,000m², a DEC lasts 12 months and the advisory report 7 years. For buildings over 250m² up to 1,000m², both last 10 years. In Northern Ireland a DEC lasts 12 months whatever the size.

What is the fine for not having a DEC?

Trading standards can issue a £500 penalty charge for failing to display a valid DEC and £1,000 for not having a valid advisory report. You still need to commission the documents after paying.

How much does a DEC cost?

There's no fixed price. GOV.UK says it varies by assessor and the size of the property. Floor area, meter data quality, whether it's a first DEC or renewal, and how many buildings you commission all affect the quote.

What does an operational rating of 100 mean?

100 means the building's CO2 emissions per square metre are typical for its type, which is band D (76 to 100). Zero is a zero-carbon building and 200 is twice typical emissions. Anything above 150 is band G.

What is the difference between a DEC and an EPC?

A DEC rates the energy a public building actually used over a year. An EPC rates a building's theoretical performance from its fabric and services and is needed when a building is built, sold or let. Some public buildings need both.

Do private companies need a DEC?

No. Private organisations don't need one, even if they share a building with a public body, but they can get one voluntarily.

Do I need a DEC in Scotland?

No. Public buildings in Scotland over 250m² that are frequently visited by the public must display an Energy Performance Certificate instead.

How can I improve my DEC rating?

Cut the energy you buy, or switch it to lower-carbon sources: remove out-of-hours waste, fix heating controls, fit LED lighting, add solar panels and replace gas heating with heat pumps. Because the DEC uses meter readings, the savings show at the next renewal.