If your site's peak demand is above 100 kW, your meter already records every half hour of the year. Most businesses never look at that data, yet it shows exactly when you pay the steepest network rates, how much capacity you're paying for and don't use, and what your building burns while it's empty. Here's who must have a half-hourly meter, where the 2026 settlement changes stand, how to get your data, and how to turn it into a smaller bill.

Updated 20 November 2026 · Independent guide, not the government's Great British Energy (gbe.gov.uk) · Checked against GOV.UK, Ofgem and scheme sources

100 kWPeak demand above which the Balancing and Settlement Code requires half-hourly metering
48Readings a day, every day: the data your supplier already holds
7.8pElectricity North West's 2026/27 LV red-band network rate per kWh, against 0.024p green
70%+Of all MPANs moved to market-wide half-hourly settlement by October 2026
Business, farm, school or charity? You're in the right place. Looking for help with a home? Check home energy grants →

Half-hourly metering: key facts for 2026

What it isA meter that records how much electricity you use in each 30-minute period: 48 readings a day, sent remotely to your supplier's data agent.
Who must have oneSupplies whose peak demand averages over 100 kW (the three highest months of the last 12) must be half-hourly metered under the Balancing and Settlement Code; the market-wide reforms rename this "Advanced Segment" metering. Since 1 April 2017, profile classes 05 to 08 must also be settled half-hourly.
How to checkLook at the S-number on your bill. Profile class 00 means half-hourly already; 05 to 08 were moved across under P272.
The 2026 changeMarket-wide Half-Hourly Settlement started migrating meters on 22 October 2025. Over 70% of all MPANs had moved by October 2026, and migration ends on 7 May 2027.
Why it matters to your billNetwork charges on half-hourly sites depend on the time of day, your agreed capacity in kVA and your reactive power. All three show up in the data.
Sub-meteringApproved Document L asks for sub-meters covering at least 90% of each fuel in new buildings and when building services are added or extended, and automatic meter reading above 1,000 m².

What is a half-hourly meter?

A half-hourly (HH) meter records your electricity use for every 30-minute settlement period: 48 readings a day, 17,520 in a normal year. The readings are collected remotely, usually over a mobile data link, by a data agent working for your supplier. On larger supplies the meter is fed by current transformers (a CT meter), because the current is too high to pass straight through it.

Most HH meters record more than kWh. They log reactive energy (kVArh) too, which is how network operators work out reactive power charges, and the data shows your peak demand in kW and kVA. That makes it far more useful than a monthly read, and it's the foundation for everything else on this page.

It's different from a domestic-style smart meter. Smaller business sites on SMETS smart meters can also send half-hourly reads, and under the new market-wide arrangements their data is used half-hourly for settlement too. But a smart meter is read through the national smart metering network, while a CT-fed advanced meter on a large site is read by a dedicated data agent, has a different set of charges, and is the meter network operators use to bill capacity and reactive power.

Who must have a half-hourly meter?

Three rules decide it.

  1. Over 100 kW maximum demand. The Balancing and Settlement Code (BSC) defines a "100kW Metering System" as one where the average of the maximum monthly demands in the three highest months of the previous twelve "exceeds 100kW". Section L paragraph 2.2.1 says its metering must be Half Hourly Metering Equipment, or during the market-wide migration either that or "Advanced Segment Metering Equipment", and Advanced Segment only once the reforms are fully in. Both record every half hour, so in practice, if your peak demand is above 100 kW, you're on a half-hourly meter whether you asked for one or not.
  2. Profile classes 05 to 08 (P272). Ofgem approved BSC modification P272 on 29 October 2014. In Ofgem's words, "From 1 April 2017, all businesses in profile classes 5 to 8 were required to have their energy use recorded every half hour." These were the larger non-half-hourly sites with maximum demand meters. Elexon has confirmed that a supply moved to half-hourly under P272 can't go back unless it's validly reclassified into profile class 1 to 4.
  3. Sites with generation. The same Section L rule covers a supply associated with third-party generating plant, apart from small-scale plant. If you're adding a large solar array or CHP, ask about metering early as part of your G99 connection.

How to tell from your bill

Ofgem's guide says to look at the Meter Point Administration Number (the "S" number box on your electricity bill) and read the first two-digit number to the right of the S. That's your profile class. One catch for 2026: the market-wide reforms keep the profile class only for traditional meters, so once your supply has migrated the box may no longer show one. If it's blank, ask your supplier whether you're half-hourly settled.

Profile class on your billWhat it means
00Half-hourly metered and settled. You can request your 48-a-day data now.
05, 06, 07, 08Larger maximum demand supplies that had to move to half-hourly settlement from 1 April 2017 (P272).
03, 04Smaller non-domestic supplies. Being moved onto half-hourly settlement through the market-wide programme.
01, 02Domestic profiles. Some very small businesses sit here.

Market-wide Half-Hourly Settlement: where it stands in November 2026

Until recently, only large sites were settled on their actual half-hourly use. Everyone else was settled on estimates built from average "load profiles". Market-wide Half-Hourly Settlement (MHHS), run by Elexon under Ofgem's direction, moves every meter in Great Britain onto actual half-hourly data. Here are the milestones, from Elexon's published timetable:

MilestoneWhat it isDateStatus at 20 Nov 2026
M10Central systems ready for migrating MPANs22 September 2025Met
M11Start of 18-month migration for unmetered supplies and advanced meters (the meters "normally used by larger non-domestic consumers")22 October 2025Started
M12Start of migration for smart and non-smart meters22 October 2025Started
M14All suppliers able to take on MPANs under the new arrangements28 October 2026Date passed
M15Full transition complete: the end of meter migrations7 May 2027To come
M16Cut-over to a new, shorter settlement timetable2 July 2027To come

Progress is ahead of the halfway mark. On 23 October 2026 the MHHS Programme reported that "over 25 million Meter Point Administration Numbers (MPANs) have been migrated to MHHS arrangements, which represents over 70% of the total MPANs", with 44 suppliers actively migrating. Elexon says settlement, which takes 14 months to complete today, will drop to four months once the programme is done.

What it means for a 100 kW+ site

  • Your meter probably won't change. You already have a half-hourly meter. What changes is the paperwork behind it: the agents your supplier appoints and the data flows between them.
  • The agent names change. The Retail Energy Code Company's briefing says the Meter Operator "will be rebadged as 'Metering Service'", and new roles include the Advanced Meter Equipment Manager and the Advanced Data Service. If your contract names an HHMOA, HHDC or HHDA, ask your supplier who holds those roles after migration.
  • Time-of-use pricing becomes normal across the market. When every supplier settles every customer half-hourly, more contracts will price by time of day. A site that already knows its half-hourly profile is in a much better position to pick the right one.

Meter operator, data collector and data aggregator: what you're paying for

Ofgem's guide explains that suppliers "employ 'agents' responsible for reading your meter, collecting data". On a half-hourly supply there are three, and their costs reach you either as separate lines on your bill or bundled into a "metering" or "standing" charge:

Agent (old name)What they doNearest role under MHHS
Meter Operator (HHMOA, often "MOP")Owns or leases, installs, maintains and fixes the meter and its CTs and communicationsMetering Service (Advanced Meter Equipment Manager)
Data Collector (HHDC)Reads the meter remotely, checks the readings and estimates any gapsAdvanced Data Service
Data Aggregator (HHDA)Adds up half-hourly volumes and sends them into central settlementReplaced by Elexon's central Volume Allocation Service

Two things are worth knowing. First, Ofgem says that while your supplier normally appoints these agents, "there's no reason you can't appoint your own instead". Large multi-site businesses often do, to control the contract length and get cleaner data. Second, Ofgem warns that some businesses "may have been asked to pay more" after moving to half-hourly, because collecting and processing the data takes more work. If your metering line has crept up, ask for it itemised and check how long the agent contracts run.

CT-metered sites also face a maximum import capacity (MIC) charge. Ofgem's guide says the network operator will charge it, and that you can contact your network operator if it looks too high. That charge is one of the biggest wins in your data, below.

How to get your half-hourly data

Your data already exists. You just need to ask for it in a form you can use.

  1. Ask your supplier for 12 months of half-hourly data for each MPAN, in a spreadsheet (CSV), with kWh and kVArh in separate columns. Many suppliers put it in the online account for half-hourly customers. Ask for actual readings to be flagged separately from estimates.
  2. Get the matching bills or a bill breakdown that splits energy, network charges (DUoS and TNUoS), capacity, reactive power and metering. You need both to put a pound sign on each half hour.
  3. Find your agreed capacity. Your MIC (in kVA) is on your bill or in your connection agreement. If you can't find it, your network operator can confirm it.
  4. Find your network region and tariff. Your bill or the MPAN's distributor ID tells you which network operator you're on. Each publishes its own time bands and rates every April.

Once you have it, plot it as a heat map: days down the side, the 48 half hours across the top. Ten minutes with that picture usually shows more than a year of monthly bills. You'll see the shape of your working day, what runs at 3am on a Sunday, and how close your peaks come to your capacity.

Four ways half-hourly data cuts your bill, with real 2026/27 rates

1. Move load out of the red band

Network operators charge half-hourly sites a different distribution (DUoS) rate for each time band. The red band is the evening peak, and the gap between red and green is huge. These are the 2026/27 rates from two network operators' own schedules of charges, for the LV Site Specific Band 1 tariff, which suits many half-hourly sites connected at low voltage:

Network operator (2026/27)Red bandAmber bandGreen bandRed unit rateAmberGreen
Electricity North WestWeekdays 16:00 to 19:00Weekdays 09:00 to 16:00 and 19:00 to 20:30; weekends 16:00 to 19:00All other times7.832p/kWh0.425p0.024p
NGED West MidlandsWeekdays 16:00 to 19:00Weekdays 07:30 to 16:00 and 19:00 to 21:00Weekdays 21:00 to 07:30, and all weekend6.515p/kWh0.827p0.100p

Weekday bands apply on bank holidays too, and the times are UK clock time. In the North West a red-band kWh costs more than 300 times a green one in network charges alone. These are network charges only: your energy price sits on top, and whether you see these exact rates depends on your contract. On a "pass-through" contract they reach you directly; on a fixed contract your supplier prices them in.

Worked example. A North West factory finds from its data that 50 kW of compressors, chillers and batch processes run through the red band every weekday. Move that load to green hours:

  • Energy moved: 50 kW x 3 hours x 260 weekdays = 39,000 kWh a year
  • Saving per kWh: 7.832p minus 0.024p = 7.808p
  • Network saving: 39,000 x 7.808p = about £3,045 a year, before any saving on the energy price itself
  • The same shift in the West Midlands: 39,000 x (6.515p minus 0.100p) = about £2,502 a year

Not every load can move. Pre-cooling a cold store before 16:00, running a battery through the red band, or shifting a wash cycle or charging schedule are the usual candidates. Fleet EV charging is often the easiest load of all to move.

2. Right-size your capacity charge

You pay for your agreed capacity in kVA every day, used or not. Electricity North West's LV Site Specific rate is 6.92p per kVA per day; NGED West Midlands' is 10.66p. Your half-hourly data shows your true peak.

  • A site with an agreed capacity of 500 kVA whose data shows a highest peak of 340 kVA over 12 months
  • Reducing to 400 kVA, leaving headroom: 100 kVA less
  • At ENWL's rate: 100 x 6.92p x 365 = about £2,526 a year; at NGED West Midlands' rate, about £3,891

A lower capacity is a request to your network operator and getting it back later isn't guaranteed, so leave room for growth. The data also works the other way: if your peaks breach your capacity, you'll pay an excess capacity charge, and the data shows which half hours cause it.

3. Spot reactive power charges

Because the meter records kVArh, you can see half hour by half hour whether your reactive energy runs above 33% of your kWh, the line at which network operators such as Electricity North West start charging. If it does, our power factor correction guide shows how to size the fix and work out the payback from the same data.

4. Cut out-of-hours baseload

Your data's quietest half hours, typically 2am to 4am and Sunday afternoons, show your baseload: what runs when nobody's there. It's often the cheapest saving on the whole site, because much of it is simply things left on.

  • A warehouse open 60 hours a week runs empty for 108 hours a week, 5,616 hours a year
  • Its data shows a 45 kW overnight baseload; a walk round finds 15 kW of lighting, heaters and idle kit that could be off
  • 15 kW x 5,616 hours = 84,240 kWh a year
  • Value at your own unit rate. At 24.51p per kWh, the average non-domestic price including CCL that DESNZ reported for the second quarter of 2026, that's about £20,650 a year

Lighting is usually the first culprit: LED lighting with occupancy controls removes it permanently. Heating and air conditioning that run outside occupied hours are a controls problem, which our building management system guide covers.

Sub-metering: when your main meter isn't enough

Your half-hourly meter shows the whole site. It can tell you that 45 kW runs overnight, but not whether it's the compressor, the server room or the car park lights. Sub-meters measure individual circuits, plant or tenants, so every kWh has an owner.

What Approved Document L requires

In England, Approved Document L Volume 2 (2021 edition incorporating 2023 amendments), paragraph 5.17, says energy sub-metering "should be installed in new buildings, or when fixed building services are provided or extended in an existing building". The system should:

  • sub-meter end uses such as heating, lighting and cooling "in such a way that at least 90% of the annual energy consumption of each fuel can be assigned to an end-use", following CIBSE's TM39
  • let forecast energy use be compared with actual use
  • let each tenant's energy use be monitored separately
  • monitor the output of any renewable systems separately, such as solar panels
  • in buildings with a total useful floor area greater than 1,000 m², include automatic meter reading and data collection

The 2026 edition of Approved Document L, which takes effect on 24 March 2027 for most building work in England, carries the same five requirements over as paragraph 4.19. Scotland, Wales and Northern Ireland have their own building standards, so check locally.

Where sub-meters earn their keep

  • Multi-tenant buildings: recharging tenants on measured use rather than floor area.
  • Big single loads: compressed air, refrigeration, process heat, chillers. Measuring them proves whether a fix, such as variable speed drives on fans and pumps, actually saved what was promised.
  • Proving a project: a meter on the circuit before and after an upgrade is the cleanest evidence you'll get, and lenders and grant funders increasingly ask for it.
  • Reporting: large companies reporting under SECR or assessed under ESOS need defensible numbers, and sub-metered data makes the energy audit faster and cheaper.

Energy monitoring systems and energy management systems

The words get used loosely, so here's how they break down:

WhatWhat it doesBest for
Your supplier's portalShows your main meter's half-hourly data, usually freeEvery half-hourly site: start here
Energy monitoring systemCollects main and sub-meter data into dashboards, alerts and reports (for example, "baseload up 20% on the usual level")Sites with sub-meters, several buildings or several sites
Energy management systemMonitoring plus a process: targets, named owners, regular reviews. Sometimes certified to ISO 50001Larger organisations that want savings to stick
Building management system (BMS)Controls heating, cooling, ventilation and lighting, often with its own meteringBuildings where the waste is in HVAC hours and set points

Monitoring finds the waste, but it doesn't switch anything off. The savings come from what you do with the alerts: change a timer, fix a leak, move a batch. Budget for someone's time to act on them, or the dashboard becomes wallpaper.

What sub-metering and monitoring cost, and how to judge a quote

We haven't found a public price list we'd stand behind, so we don't quote pounds per meter. The cost depends on a few things you can control:

  • Number of meters and how hard they are to fit. Clip-on CT meters on an accessible distribution board are quick; anything that needs a shutdown or a new panel costs more.
  • Communications. Wired to a local network, wireless, or a mobile data link per meter.
  • Software. Often a monthly or annual fee per meter or per site.
  • Accuracy class. Billing-grade meters for tenant recharging cost more than monitoring-grade ones.

The test is the same as for any energy measure. Start with your free half-hourly data: price your red-band use, your unused capacity and your out-of-hours baseload, using the method above. Then ask each installer to say which of those savings sub-metering will unlock and how. Divide the installed cost plus a year of software by the saving you can identify, and you have a payback in years. A good proposal names the circuits, the loads behind them and what you'll do differently once you can see them.

On tax, sub-meters fitted as part of your electrical installation may qualify for the Annual Investment Allowance; see our capital allowances guide and check with your accountant.

When extra metering is not worth buying

  • You haven't looked at the data you already have. A 100 kW+ site has a year of half-hourly data sitting with its supplier. Read it first. Many sites find the red-band, capacity and baseload savings from the main meter alone.
  • Your site is small and simple. A shop or small office with one supply and lighting as its main load will learn most of what it needs from a smart meter and the supplier's app.
  • Nobody will act on it. Sub-meters without a named person reviewing them each month rarely pay back.
  • You're on a fully fixed contract with no time-of-use element. Shifting load out of the red band may not change your bill until your next contract. Baseload and capacity savings still count.
  • Someone wants to replace a working half-hourly meter. The meter is your supplier's or agent's responsibility. You rarely need a new one to get better data; you need the data you have.

Where half-hourly data leads next

Sources checked 20 November 2026

Great British Energy is an independent guide. We are not affiliated with Great British Energy, the publicly owned energy company (gbe.gov.uk), HM Government, Ofgem or OZEV. Scheme rules and budgets change, so confirm the current position with the scheme administrator before you commit spend. We may receive a fee from the installer we introduce you to.

Half-hourly metering questions

What is half-hourly metering?

A meter that records your electricity use in every 30-minute period, 48 readings a day, and sends them remotely to your supplier's data agent. Larger sites use current transformer (CT) meters that also record reactive energy (kVArh).

Who needs a half-hourly meter?

Under the Balancing and Settlement Code, supplies whose peak demand averages over 100 kW across their three highest months of the last year must be half-hourly metered (called Advanced Segment metering under the new market-wide arrangements). Since 1 April 2017, supplies in profile classes 05 to 08 must also be settled on half-hourly data (BSC modification P272). Most other supplies are now being moved onto half-hourly settlement through the market-wide programme, which finishes on 7 May 2027.

How do I know if I have a half-hourly meter?

Look at the S-number (MPAN) box on your electricity bill. The first two digits to the right of the S are your profile class. 00 means you're half-hourly metered; 05 to 08 were moved to half-hourly settlement under P272. Supplies already migrated to market-wide half-hourly settlement may show no profile class, so if it's blank ask your supplier.

What is Market-wide Half-Hourly Settlement?

An industry programme run by Elexon under Ofgem's direction to settle every electricity meter in Great Britain on actual half-hourly data rather than estimates. Migration started on 22 October 2025; by 23 October 2026 over 70% of all MPANs had moved, and migration is due to end on 7 May 2027.

How do I get my half-hourly data?

Ask your supplier for 12 months of half-hourly data per MPAN as a CSV, with kWh and kVArh, and with estimated readings flagged. Many suppliers provide it in their online account for half-hourly customers.

What are DUoS red, amber and green bands?

Time bands that network operators use to set distribution charges for half-hourly sites. In Electricity North West's 2026/27 statement the weekday red band is 16:00 to 19:00, and the LV Site Specific Band 1 red rate is 7.832p per kWh against 0.024p in the green band.

Is sub-metering a legal requirement?

In England, Approved Document L Volume 2 says new non-domestic buildings, and existing buildings where fixed building services are added or extended, should have sub-metering covering at least 90% of each fuel's annual use, with automatic meter reading in buildings over 1,000 m². It doesn't require existing buildings to retrofit sub-meters otherwise.

Get your site quoted properly

Two minutes now saves weeks of ring-rounds. Tell us about your site and we will introduce one suitable installer.

Get a free half-hourly data review →